My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153349 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153349 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2010 2:55:18 PM
Creation date
10/6/2006 12:00:41 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153349
Contractor Name
Brook Forest Water District
Contract Type
Loan
Water District
9
County
Jefferson
Bill Number
SB 80-67
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br /> <br />I <br /> <br />of the water system, it is not considered economically feasible to upgrade <br /> <br /> <br />protection to meet the I.S.O. recommended criteria. Complete adherence to <br /> <br /> <br />the criteria would require replacement of major portions of the distribution <br /> <br /> <br />system. Therefore, it appears to be advisable to concentrate on providing <br /> <br />facilities which will allow rapid refilling of the fire tanker trucks. Fire <br /> <br /> <br />hydrants should be added to the distribution system to minimize travel and <br /> <br /> <br />refill times for the fire trucks. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />-43- <br />
The URL can be used to link to this page
Your browser does not support the video tag.