My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153349 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153349 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2010 2:55:18 PM
Creation date
10/6/2006 12:00:41 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153349
Contractor Name
Brook Forest Water District
Contract Type
Loan
Water District
9
County
Jefferson
Bill Number
SB 80-67
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />1. Meet with the representati~e8 of the Colorado Water Conservation <br />Board, the Brook Forest Water District, and other private or public <br />agencies for basic information and data gathering. <br /> <br />I <br /> <br />2. <br /> <br />Document the history of the Brook Forest Water District <br />a description of the laws onder which it is organized: <br />its financial status and its phY8ical assets. <br /> <br />and provide <br />its powers) <br /> <br />I <br /> <br />3. Describe the land resource9 within the project area in terms of the <br />present and future land U8e, land ownership, service area boundaries, <br />and land classification. . <br /> <br />I <br /> <br />4. Compile information related to the existing water supply and prepare <br />a project map illustrating the existing project features. <br /> <br />I <br /> <br />5. Provide engineering analys~s of the existing system and determine <br />its capacity, operation problems, and its cost. It is assumed <br />that such an analysis will be ba8ed on the elevations obtained from <br />the U.S. Geological Survey quadrangle sheets. <br /> <br />I <br /> <br />I <br /> <br />6. Study different water re80~rces considerations related to the Brook <br />Forest Water Supply System. <br /> <br />A. Identify the existing snd develop the future water requirements. <br /> <br />I <br /> <br />B. Estimate the water 108se8 within the water supply system. <br /> <br />I <br /> <br />C. Identify the sources of existing and potential future water <br />supplies. <br /> <br />I <br /> <br />D. Compile and list information related to the water rights and <br />well permits available to the district. <br /> <br />E. Document the historical water use by the di8trict. <br /> <br />I <br /> <br />F. Describe the water quality parameters related to the water <br />supply sY8tem. <br /> <br />I <br /> <br />7. Identify the future water requirement8 and develop alternative <br />plans to meet such requirements. <br /> <br />I <br /> <br />8. Evaluate alternative plans and select a specific plan for imple- <br />mentation. <br /> <br />I <br /> <br />A. Provide the necessary geologic inve8tigations. <br /> <br />I <br /> <br />B. Describe the criteria and standards used in the design of <br />the proposed structures. <br /> <br />I <br /> <br />I <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.