My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00538
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/6/2006 12:00:24 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153581
Contractor Name
Minnesota Canal and Reservoir Company
Water District
0
County
Gunnison
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> TABLE 6.1 <br /> STORM EVENTS <br /> Precipitation (inches) <br />Recurrence Storm Duration <br />Interval <br />(Years) 6 Hours 24 Hours <br />50 1.8 2.6 <br />100 2.0 2.8 <br />Reference: (NOAA, 1973) <br /> <br />The Probable Maximum Precipitation (PMP) for the project site has been estimated using <br />analytical methods proposed by the National Oceanic and Atmospheric Administration (NOAA, <br />1986). PMP calculations were performed for the project site drainage basin for the months July, <br />August, and September. These three months represent the summer months where maximization <br />of the PMP is most likely. The" general storm" PMP (convergence PMP and orographic PMP) <br />Cor various durations is presented in Table 6.2. Derivation of PMP estimates are provided in <br />Appendix e. <br /> <br /> TABLE 6.2 <br /> GENERAL STORM PMP (SEPTEMBER) <br />Duration (hrs) 6 12 18 24 48 72 <br />PMP (in) 4.6 6.6 8.1 9.3 12.6 14.1 <br /> <br />The time sequenced "local storm" PMP, as which may be generated during localized <br />thunderstorm events, is provided in Tables 6.3 and 6.4. <br /> <br /> TABLE 6.3 <br />THUNDERSTORM INCREMENTAL PMP <br />Duration (min) 15 30 45 60 <br />Incremental PMP (in) 4.8 1.2 0.5 0.4 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.