My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153607L Bylaws and Adendums
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153607L Bylaws and Adendums
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 2:33:46 PM
Creation date
10/6/2006 12:00:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153607L
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Bill Number
SB 92-87
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> , . <br />i . . <br />I " . . <br />I <br /> <br /> <br />Chapter IV, 'Water <br /> <br />Scope: <br /> <br />Determine and list the water rights and decrees associated <br />with Mountain lIome Reservoir and provide historical data <br />concerning water storage or water use, Also determine water <br />quality and sedimentation characteristics of the reservoir. <br /> <br />Cost: <br /> <br />Engineering - 30 hrs, @ $ 60,00 <br />Autocad Technician - 10 hrs, @ $35 <br />Report Preparation <br /> <br />Subtotal <br /> <br />$ 1800.00 <br />$ 350,00 <br />$ 100,00 <br />$ 2250.00 <br /> <br />Chapter V, Plan of Development <br /> <br />Scope: This chapter provides the detailed engineering analysis of the <br />dam and appurtenant structures and provides the physical <br />plan for rehabilitation, This Includes geologic evaluation, <br />geotechnical, hydrology, and structural evaluation and draw- <br />"Ings detailing the proposed construction. <br /> <br />Cost: <br /> <br />Geotechnical Engineering - <br />Engineering - 100 hrs, @ $60 <br />Autocad Technician - 40 hrs, <br /> <br />$ 6000.00 <br />@ $35 $ 1400.00 <br /> <br />Surveying - 10 hrs, @ $65 <br />- 8 hrs. @ $50 <br /> <br />$ 660,00 <br />$ 400.00 <br /> <br />Hydrologic & Hydraulic Analysis <br />Engineering - 60 hrs. @ $ 66 <br />Autocad Technician - 8 hrs, @ $35 <br /> <br />$ 3300.00 <br />$ 280,00 <br /> <br />Subsurface Investigation <br />Terracon Consultants <br /> <br />$14000.00 <br /> <br />Geologic Investigation <br />Earth Science Associates <br />Subtotal <br /> <br />$ 4000,00 <br />$30030.00 <br /> <br />Chapter VI, Estimated Costs <br /> <br />,Scope: The purpose of this chapter Is to determine the anticipated <br />project costs, This will Include quantity take-offs of the <br />anticipated construction and a determination of the expected <br />costs for design, contingencies, right-of-way acquisition, etc, <br /> <br />Cost: <br /> <br />Engineering - 20 hrs. @ $60 <br />Report Preparation <br /> <br />Subtotal <br /> <br />$ 1200,00 <br />$ 100,00 <br />$ 1300.00 <br /> <br />Mountain Ilome Reservoir Proposal <br />Page 6 <br /> <br />'-"'/'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.