Laserfiche WebLink
<br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Feature <br /> <br />Intake System, Dam. <br />and Reservoir <br />Diversion Dam <br /> <br />Storage Dam <br />Height (ft) <br />Crest Length(ft) <br />Embankment <br />(cu-yd) <br />Reservoir <br />Area (ac) <br />Total Storage <br />(ac-ft) <br />Delivery Systems <br />Irrigation & Coal <br />Pumping Plant <br />(cfs) <br />Static Lift <br />(ft) <br />Oil Shale <br />(Sheep Creek) <br />Pumping Plant <br />(cfs) <br />Stat ic Lift <br />(ft) <br />Lands & ROW <br />Acquisition <br />Required (ac) <br />Major Road Relocation <br />Length (mi) <br />Power Plant <br />Capacity (kW) <br /> <br />TOTAL CAPITAL COST <br /> <br />TABLE 1 <br />YELLOW JACKET PROJECT <br />COMPARISON OF ALTERNATIVES <br />(1982 Dollars) <br /> <br />Avery <br /> <br />Sawmill Mountain <br /> <br />$49,336,000 <br /> <br />$131,312,000 <br /> <br />Earth, Concrete <br />Overflow <br /> <br />Earth, Concrete <br />Overflow <br /> <br />210 <br />1,950 <br />2,800,000 <br /> <br />350 <br />1,550 <br />1,600,000 <br /> <br />675 <br />56,200 <br /> <br />490 <br />57,820 <br /> <br />$26,171,000 <br />131 <br /> <br />$19,579,000 <br /> <br />260 <br />$13,651,000 <br />40 <br />1,120 <br />$ 3,200,000 <br />880 <br /> <br />$13,651,000 <br />40 <br /> <br />1,120 <br />$ 730,000 <br />680 <br /> <br />$92,358,000 <br /> <br />$165,272,000 <br /> <br />ES-5 <br /> <br />Warner Poi nt <br /> <br />$44,546,000 <br /> <br />190 <br />1,200 <br />840,000 <br /> <br />960 <br />65,000 <br /> <br />$31,789,000 <br />131 <br /> <br />415 <br /> <br />$13,651,000 <br /> <br />40 <br /> <br />1,120 <br /> <br />$ 4,920,000 <br />1,230 <br /> <br />$10,394,000 <br />5.1 <br />$ 5,269,000 <br />4,600 <br /> <br />$110,569,000 <br />