My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00532
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:59:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, .- <br />... -,' Ir <br /> <br />. <br /> <br />. <br /> <br />Attachment I <br /> <br />J ' <br /> <br />WILLIAM E. BOHLENDER <br /> <br />ATTORNEY AT LAW <br />1327 10TH AVENUE <br />GREELEY, COLORADO 80831 <br /> <br />TELEPHONE: (303) 3156.68156 <br /> <br />June 8, 1987 <br /> <br />N.C. Ioannides, P.E., Chief <br />Project Planning and <br />Construction Section <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />Re: Feasibility Study <br />Contract between City of Greeley <br />Water and Sewer Board and <br />State of Colorado Water <br />Conservation Board Concerning Barnes Meadow Dam <br /> <br />Dear Mr. Ioannides: <br /> <br />On May 21, 1987, I rendered a legal opinion regarding the ability <br />and legality of the City of Greeley, through its Water and Sewer <br />Board, to enter into a contract with the Colorado vlater Conservation <br />Board (CWCB) for an engineering feasibility study for the <br />rehabilitation of Barnes Meadow Dam. You conveyed the need for this <br />legal opinion during a conversation with Mr. Eric Wilkinson on May 15, <br />1987. That opinion, as you directed, addressed the same points as <br />specified in your letter of June 17, 1986 (relating to the three 1986 <br />feasibility studies). The opinion was enclosed as Attachment B in the <br />letter to you from Mr. Mark H. Rybus, Director of the Greeley Water <br />and Sewer Department, dated May 21, 1987. That legal opinion was <br />based on the assumption that the 1987 Contract for the Barnes Meadow <br />Dam feasibility study would be similar to the 1986 Contract (Contract <br />No. C-153467) between the CWCB and the City of Greeley. <br /> <br />I have reviewed the proposed Contract between the CWCB and the <br />City of Greeley for the Barnes Meadow Dam Study and have indeed found <br />it to be similar to the 1986 Contract (Contract No. C-153467). This <br />letter shall serve to confirm the legal opinion previously submitted <br />with the May 21, 1987 letter from Mr. Rybus. As the requirements for <br />a legal opinion specified in your letter of May 29, 1987 are the same <br /> <br />, ------ <br />
The URL can be used to link to this page
Your browser does not support the video tag.