My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00532
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:59:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />lr~\ <br />I <br /> <br />prepare, with the assistance of the <br />engineering firm referred to in paragraph <br />B.1. above, an estimate of the funds required <br />from the state for project engineering and/or <br />construction during that month and shall <br />forward said estimate to the state not ~ess <br />than fifteen (15) days prior to the beginning <br />of such month. <br /> <br />b. upon receipt and approval by the state <br />of such monthly estimate, the state will, <br />within forty (40) days from the receipt of <br />such estimate, pay over to the Contractor the <br />amount of the monthly estimate or such <br />portion thereof as has been approved by the <br />state. <br /> <br />c. No payments will be made under this <br />contract for project construction until the <br />project plans and specifications referred to <br />in paragraph B.1. above are approved by the <br />state. <br /> <br />- <br />J. Upon completion o~ the repayment to the State <br />in the Sum of Five Hundred Three Thousand Eight <br />Dollars and Eighty-Eight Cents ($503,008.88), as <br />set forth in paragraph B.11.b. of this contract, <br />the State agrees to convey to the Contractor all <br />of the state's right, title, and interest in and <br />to the project and any other property described in <br />paragraph B.12. by deed or other proper <br />conveyance; <br /> <br />4. The repayment schedule (Exhibit A of the Original <br />contract) is hereby amended as shown in Attachment B, which is by v/ <br />this reference incorporated and made a part hereof. <br /> <br />5. The effective date of this Contract Amendment No. 1 <br />shall be seven (7) days after the day it is dated. <br /> <br />6. The Contractor pledges its full faith and credit in <br />support of this obligation and warrants that it shall lawfully <br />adopt a valid ordinance that recognizes this obligation pursuant <br />to its charter prior to the execution of this Contract. Such <br />ordinance is a condition precedent to State performance of this <br />contract. Such ordinance shall be irrepealable for the period of <br />repayment of the project contract loan. Such ordinance shall <br />specifically authorize the City to enter into this Contract. <br />Such ordinance shall specifically pledge the full faith and <br />credit of the City to repay the project contract loan in the <br />event of default. Such ordinance shall be attached hereto as <br />Attachment C and is incorporated herein by this reference. / <br /> <br />Page ~ of Z Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.