My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00532
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:59:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />.--:' <br /> <br />,/ <br /> <br />A complete hydraulic evaluation of the outlet works shall be perfomted under <br />this subtask. The .nalysis will be based on the visual inspection and review <br />of video tapes in Task 2 and will note any adverse hydraulic characteristfcs <br />wi thi n the intake. conduit. and df scharge structure, The capaci ty and <br />operati ng requi rements of the out1 et works shall be exami ned and evaluated, A <br />discharge rating curve shall be prepared to reflect existing conditions, <br />Release and dra"down criteria shall be developed and checked. The resylts of <br />these evaluations shall be the basis for fomtulating alternative solutions for <br />comparison, The structural and general operation condition of the gates and <br />conduit shall be considered in the overall detemtination of the rehabllitHlon <br />requi rements. <br /> <br />The elements of this task shall be closely coordinated "ith the activities in <br />Subtask 7,2. relating to geotechnical analysis and overall stability, <br /> <br />7.4 Miscellaneous Design Considerations <br /> <br />7.4.1 Drainage <br /> <br />Present or anticipated drainage problems shall be evaluated and discussed with <br />the CWCB and the City. A project drainage plan will be developed if necessary, <br /> <br />7.4.2 Sedimentation <br /> <br />A sedimentation analysis shall be perfomted as part of the hydrologic work. <br />Estimated rates of sediment deposition shall be calculated, Sediment storage <br />requirements shall be detemtined and the effect on the reservoir outlet <br />assessed, The bas,ic data and method used in sediment computations shall be <br />included. <br /> <br />7.4.3 Right-of-Way <br /> <br />The study shall include an evaluation of right-of-way requirements for the <br />project and the results shall be presented in the final report, <br /> <br />- 12 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.