Laserfiche WebLink
<br />EXIIIBIT B <br /> <br />;1,- i M/ft' <br />UHAH:1M. .IN: ~cNCY NUMBER <br />34-04-00 <br />CONTRAcr ROllTINC NllMBI'R <br />';-;.'7.!c''1 <br />$22,683 <br /> <br />F-wmIi.AC-02A lR 5/85) <br />W/PB <br /> <br />FEASIBILITY REPORT <br />CONTRACT <br /> <br />THISCONTRACT.madelhis ,<;.~ daYOr~"8'" b db h <br />S r rid r h 1 -,.. y an elween I e <br />lale 0 ...oora 0 or I e use and hellefit uf Ihe Deparlmenl of' Natura Resources <br />(Colorado Water Conservation Board) <br />hereinafter referred to as the Slale. 31ld '2 the Ci ty of Greeley, Greeley Cl V1C Center, <br />919 7th St., Greelev, CO 80631 <br />herl."inaher referred 10 as the (hulraetor. <br /> <br />. WHEREAS. 311.lhoriIY exi~h in the law and Funds have been budgeled. appropriated and otherwise made <br />aVilllable and a sufficIent uncncumber....d balance lhereuf remains available I., poym" I' F d N b 4008 <br />52867 . , 1 In un urn er__, <br />G/l Account Number . COlltra"c Encumbrance Number; '. i ~..." .. . and <br />ABL Account Number 12860, Org, Unit 77-77-777, <br />,WHEREAS. rE'lluirl.'d apflJII"OII. ~ llnd coordinaliun has bl'en accomplislwd from and with appwpriale <br />IIgencles: and <br /> <br />WHEREAS. pucsu&nt to the provisions of section 37-60-119. <br />Colorado Revised Statutes. as amended. the State is authorized <br />to construct certato water projects for the benefit of the <br />people of the Stat~ of Colorado; and <br /> <br />WHEREAS. the C\ty of Greeley has made apPlication to the <br />State for the impr~vement of its existing facility, the Barnes <br />Meadow Reservoir Dam, such improvement of the facility is <br />hereinafter someti~es referred to as the project; and <br /> <br />WHEREAS. the C4ntractor is a city within the State of <br />Colorado; <br /> <br />NOW THEREFORE. it is hereby agreed that: <br /> <br />1. The Contra~tor shall have a feasibility report prepared <br />and directed to th~ problem of improving the facilities of the <br />Barnes Meadow Rese~voir Dam in accordance with a proposal for a <br />project feasibility report prepared by the consulting <br />engineering firm ot Morrison-Knudsen Engineers. Inc. (the <br />Consultant), and a~proved by the State. received May 28, 1987. <br />which proposal is 4ttached hereto as Exhibit A and made a part <br />of this contract. <br /> <br />if <br /> <br />2. Fifteen (IS) copies of the final report called for in <br />this contract shall be furnished to the State not later than <br />October 31. 1987. \lnlesB such time is extended by mutual <br />agreement of the P4rties hereto in writing. <br /> <br />3. As compens4tion for the services of the Contractor. the <br />State shall pay to the Contractor the sum of Twenty-Two <br />Thousand six Hundr~d Eighty-Three Dollars ($22.683) in the <br />manner following: <br /> <br />a. Sixty pe[ce~t (60'). to wit. Thirteen Thousand Six <br />Hundred Nine D~llars and Eighty Cents ($13.609,80) of the <br />total amount d\.1e in two (2'), monthly installments of six <br />Thousand Eight Hundred Four Dollars and Ninety Cents <br />($6.804,90) each, commencing on August 14. 1987, <br /> <br />b. The remaining forty percent (40\), to wit, Nine <br />Thousand Seventy-Three Dollars and Twenty Cents ($9,073,20) <br />within forty (40) days following receipt and acceptance of <br />the written report specified in paragraph 2. of this <br />contract. <br /> <br />4. The total ~ost of services to be rendered for the <br />Contractor by the Consultant is Forty-Five Thousand Three <br />Hundred Sixty-Six Oollars ($45.366) and the Contractor shall <br />pay the sum of Twenty-1'Wo Thousand Six Hundr~d ~;ighty..1'h(ee <br />Dollars ($22.683) as agreed to by letter dated May 21. 1987. <br /> <br />./ <br /> <br />J95-5.101-1O'14 <br /> <br />4 <br />Page I of_pages <br />.ISl'cimlrlldiumtlnrcverM:uIlaslpage.1 <br /> <br />3753E <br /> <br />EXHIBIT B <br />