My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00532
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:59:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153588
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Barnes Meadow Dam <br />'.;iPB <br /> <br />,.- <br />!- <br /> <br />,.- <br />DEPARTMENT iENCY NAME <br />Yater Conser.." on Board <br />DEPARTMENT DR AGENCY NUMBER <br />PDA <br />ROUTING NUMBER Y3;;;1CfC/ <br /> !?98,424 - <br /> <br />Total Contract Amount: $290,741 <br /> <br />AMENDMENT #1 TO PROJECT CONTRACT <br /> <br />TIllS CONTRAcr, made this 14.. day o~ <br /> <br />use and henefit of .he Department of NATURAL RE OURCES <br /> <br />,CI!:1.l>. <br />~ by and between the State of Colorado for the <br /> <br />(COLORADO WATER CONSERVATION BOARD) <br /> <br />hereinafter referred to as the State, and the ci tv of Greelev. <br />1000 lOth street. Greelev. Colorado 80631 <br /> <br />hereinafter referred to as the contractor/Contractor or Borrower. <br /> <br />WHEREAS, authority exists in the law and Funds have been budgeted, appropriated and otherwise made available and a sufficient <br />unencumbered balance thereof remains available for payment in Fund Number ~ Organization YYYY ,Appropriation ~ <br />Program WTRC . Object Code 5120 . Contract Encumbrance Number; C-153588:,and <br /> <br />WHEREAS. required approval, clearance and coordination have been accomplished from and with appropriate agencies; and <br /> <br />WHEREAS, the State and the Contractor entered into a <br />contract dated Apri.l 8, 1991, Contract Encumbrance Number <br />C-153588 (hereinafter called the "Original Contract"); and <br /> <br />WHEREAS, the scope of the project identified in the Original <br />Contract was measurably increased during the final design of the <br />project; and <br /> <br />WHEREAS, one of the conditions in the Original Contract was <br />that the project be completed within thirty (30) months of the <br />date of execution for said contract; and <br /> <br />WHEREAS, the increase in scope of the project and the <br />complexity of design for the project have caused the contractor <br />innumerable delays; and <br /> <br />WHEREAS, the increase in scope of the project has increased <br />the estimated cost of the project by over Two Hundred Thousand <br />Dollars ($200,000); and <br /> <br />WHEREAS, paragraph 2 of section 1 of Senate Bill No, 85 <br />(1989) authorized the Colorado Water Conservation Board to <br />increase the initial appropriation for this project "plus or <br />minus such amounts, if any, as may be justified by reason of <br />ordinary fluctuations in construction costs as indicated by the <br /> <br />Page 1 of Z Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.