My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153333 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153333 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:43:55 AM
Creation date
10/5/2006 11:59:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153333
Contractor Name
Beaver Park Water, Inc.
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 80-67
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~. - - - - - - - - - - - - - - - - - - <br /> <br /> Table IV-l, PENROSE WATER DISTRICT USE (AF) <br /> JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL <br />1977 11.1 10.) 10,8 1).1 15,0 2).0 26,7 26,) 21.2 19.6 22.1 15.) 215 <br />1978 14,) 11,'1 12.6 16,) 16,2 21.0 25.0 25,8 26,4 19,7 .18,) 16.7 224 <br /> <br />Table IV-2, IRRIGATION WATER REQUIREMENTS (inches) <br /> <br />Crop APR MAY JUN JUL AUG SEP OCT TOTAL <br />Effective Rain ,58 .68 1.25 1.90 1.95 1.25 .44 8.05 <br />Alfalfa 2,0 4,1 5,9 6.6 5,) ).5 2.2 29,6 <br />Orchard 1.1 ).2 4.8 5,4 ),7 1.) 0,4 19,9 <br />Grain 0,) 2,0 6.) ),5 0 0 0 12.1 <br /> <br />H <br /><: <br />I <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.