My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00529
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:59:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153785
Contractor Name
Chipperfield Lane Ditch, Inc.
Contract Type
Loan
Water District
39
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1'- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- . <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />fAX, (303) 866.4474 <br /> <br />STATE OF COLORJ\DO <br />IM\ <br />~ <br /> <br />Roy Romer <br />GovernOI <br /> <br />May 14, 1997 <br /> <br />Jtlmes S. lochheild <br />Executive Director, DNR <br /> <br />O<lriesC. Life, Pf. <br />Director, eWeR <br /> <br />Mr. Larry Linville, President <br />Chipperfield Lane Ditch, Inc. <br />531 Co. Rd 326 <br />Silt, CO 81652 <br /> <br />RE: Construct New Headgate and <br />Raw Water Pipelines. <br />Loan Approval <br /> <br />Dear Mr. Linville, <br /> <br />Concerning your application for a loan from the Construction Fund, I am pleased to inform you <br />the Colorado Water Conservation Board (CWCB) has approved your request for $60,000 from <br />the Small Project Loan Account. It is our understanding these funds will be used to construct <br />a new headgate and raw water pipelines to deliver water from the Multa Trina Ditch. <br /> <br />The CWCB approved a loan term of 30 years at an interest rate of 3.75%. I have attached a <br />copy of the updated Board memo concerning Chipperfield Lane Ditch, Inc. Please refer to page <br />3 of that memo and to the section "Action Taken by the CWCB, May 12, 1997". <br /> <br />The Board. has approvcd the loan subject to several conditions: <br /> <br />a. You must adhere to the CWCB Guidelines for Financial Assistance. A copy of. <br />our Guidelines is attached. <br /> <br />b. A Feasibility Study must be completed. A sample feasibility study has been <br />provided to Mr. Dennis Davidson of the NRCS. Please assist Dennis, so that he <br />can complete an initial draft. The draft (and computer disk) should be sent to <br />Jolm Van Sciver (303-866-3441) for review. John will complete the study, with <br />your assistance, so that the content of the report is in compliance with the <br />Guidelines and statutory requirements. <br /> <br />c. An approved contract must be in place before construction can proceed. Jan lllian <br />of this office (303-866-3441) will contact you concerning our contracting <br />procedure. It usually takes 2 to 3 months to complete the contract. No CWCB <br />funds can be disbursed until the loan contact is signed by all parties. <br />
The URL can be used to link to this page
Your browser does not support the video tag.