My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00529
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:59:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153785
Contractor Name
Chipperfield Lane Ditch, Inc.
Contract Type
Loan
Water District
39
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB CoDStnlction Fund Loan Applieation <br />Revised January 31, 1994 <br /> <br />4. Is the organization incorporated in the State of Colorado? YES _ NO_ <br />(If ."YES", please include a copy of th~ articles of incorporation, and the Bylaws with <br />this application form.) The group is in the process of incorporatiIDJ <br /> <br />in the state of Colorado. <br />5. Please provide a brief description of the owner's existing water supply facilities and <br /> <br />describe any existing operational or maintenance problems. (Attach separate sheets and <br /> <br />a map, if needed.): <br /> <br />Existing system is an open Qitch delivery system that has a larqe <br /> <br />amount of water loss due to ~eeDt=!oe nnn In.c:l.c:: frnm rlirr"h hrp~k~gp <br /> <br />6. <br /> <br />For existing facilities indicate: <br /> <br />(a) the number of shareholders 5 <br />(b) the number of customers served <br /> <br />or <br />5 <br /> <br />Part B. - Description of the Project <br /> <br />1. <br /> <br />Name of the project or facility: <br /> <br />Clripperfield Lane Group <br /> <br />2. What is the purpose of this loan applic:ttion? Check one, <br /> <br />_ New project <br />...x Rehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency Repair <br />_ Other (describe) <br /> <br />3. If tbe project.is. for rehabilitation of an existing reservoir, is the reservoir cum:ntly under <br />a. storage restriction order from the Slate Engineer? YES _ NO x <br /> <br />2 <br /> <br />. .1 <br />. . <br /> <br /> <br /> <br />'I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.