Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />Institutional Considerations <br /> <br />I <br /> <br />Technical assistance is being provided by the Natural Resource <br />Conservation Service (NRCS). <br /> <br />I <br />I <br /> <br />The CLDC has been approved by the CWCB to borrow $60,000 from the <br />Construction Fund Small Project Loan Account. The loan from the <br />CWCB is contingent upon the successful negotiation of a contract <br />between the CWCB and CLDC. <br /> <br />Opinion of Feasibility <br /> <br />I <br /> <br />This project will result in significant water savings, reduced <br />erosion, and a more efficient and effective irrigation system. <br />This will result in increased crop production, aesthetics of the <br />area, and improved land management methods. <br /> <br />I <br /> <br />The selected alternative is technically and financially feasible. <br />There are no known roadblocks which would keep the CLDC from <br />successfully completing this project. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />Feasibility Study <br />Chipperfield Lane Headgate and Pipeline <br />June 1997 <br /> <br />9 <br /> <br />I <br />