<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The NRCS estimates the costs of the completed project at $325,550. The NRCS cost breakdown <br />for the project is given below in Table 2, Operation and maintenance costs for this project are <br />expected to be minimal over the next twenty years. <br /> <br />Table 2. Pine River Canal Company - Tunnel Hill Project - Cost Estimate <br /> <br />Item Quantity Unit Unit Price Amount <br />Six foot diameter reinforced concrete pipe 700 ft, Ft. $225 $157,500 <br />Excavation, installation, compaction, traffic 700 ft Ft. $100 $70,000 <br />control <br />Inlet and Outlet structures (one each) I Job $37,500 $37,500 <br />Appurtenances and incidentals I Job $34,000 $34,000 <br />Engineering and construction inspection I Job $26,550 $26,550 <br />Total $325,550 <br /> <br />Implementation Schedule <br /> <br />The NRCS is expected to complete the final design by mid-January 1999, Construction is <br />expected to begin summer 1999 and to be completed fall 1999. <br /> <br />Permitting <br /> <br />This project does not fall under the Corps of Engineers jurisdiction and as such is exempt from <br />regulation under Section 404 of the Clean Water Act and does not require a permit. Section 401 <br />certification by the State of Colorado is not required in the absence of a 404 Permit process. The <br />Colorado State Highway Department requires a Utility Permit that will allow partial closure of <br />the highway during construction, This will be obtained before starting construction, <br /> <br />Institutional Considerations <br /> <br />Entities that are, or may be, involved in the design, construction, and financing of the project <br />include: <br /> <br />Pine River Canal Company (PRCC); financing, project management <br /> <br />Colorado Water Conservation Board (CWCB); financing and construction, <br /> <br />Natural Resources Conservation Service (NRCS); design and construction <br /> <br />Pine River Canal Company <br />Tunnel Hill Project Feasibility Study <br />January 1999 <br /> <br />Page 12 of 15 <br />