My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00527
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0024X
Contractor Name
Florida Water Conservancy District
Contract Type
Loan
Water District
0
County
La Plata
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I HARRIS WATER ENGINEERING <br /> <br />I <br />Steven C, Harris, P.E. <br /> <br /> <br />I November 25, 1985 <br /> <br />I <br />I <br /> <br />I Re: Lemon Dam Project <br />I Dear Mr. Law: <br /> <br />I <br />I <br />I <br />I <br />.' <br />I <br /> <br /> <br />I, Sincerely, <br /> <br />,j~ c1f~ <br /> <br />I, Steven C. Harris, P.E. <br /> <br />954 Second Avenue <br />Durango, Colorado 81301 <br />(303] 259-5322 <br /> <br />Dan Law <br />Associate Director <br />Colorado Water Resources and <br />Power Development Authority <br />1580 Logan Street, Suite 620 <br />Denver, Colorado 80203 <br /> <br />The Authority and Harris Water Engineering (HWE) entered into an <br />Agreement on December 12, 1984, for HWE to perform a feasibility study <br />and prepare a report on the Lemon Dam Project. Notice to begin the <br />study was given on February 15, 1985. The study has been completed and <br />attached is the final Feasibility Report on the Project, with Volume I <br />being the Report and Volume II the Appendices to the Report. <br /> <br />In addition to the Feasibility Report, a Federal Energy Regulatory <br />Commission License Application has been prepared (Appendix A) and <br />submi tted on the hydropower component of the project. A special use <br />permit application has also been submitted to the U. S. Fore'st Service <br />to construct the power plant and transmission line. <br /> <br />Numerous State and Federal agencies were contacted during the course of <br />the study, particularly the Bureau of Reclamation and Colorado Division <br />of Wildlife. The ideas and concerns of all the agencies have been <br />incorporated into the project plan. <br /> <br />Thank you for the opportunity to work with the Authority on <br />Dam Project. I look forward to further involvement with the <br />as the project progresses toward construction. <br /> <br />the Lemon <br />Authority <br /> <br />SCH:ts <br /> <br />I <br />I, <br />. <br /> <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.