My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00527
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0024X
Contractor Name
Florida Water Conservancy District
Contract Type
Loan
Water District
0
County
La Plata
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />4.0 PLAN OF DEVELOPMENT <br /> <br />The Lemon Dam Project would involve installation of a new <br />hydropower plant and repair of existing facilities at Lemon Dam. <br />The District is responsible for operation of the dam and employs <br />a dam superintendent who lives adjacent to the dam. Reclamation <br />provides assistance to the District and makes annual inspections <br />of the dam. <br /> <br />The plan of development formulated for the project is sum- <br />marized in the following paragraphs and is described in detail in <br />the following chapters. A FERC License is required prior to <br />construction of the power plant; the application for the license <br />is attached as an appendix to this report. <br /> <br />The proposed plan of development described in the application <br />for funding to the Authority consisted of three components: <br />1) Replace deteriorated riprap. <br />2) Repair leakage at the main outlet gates. <br />3) Install a 110kW hydroelectric power plant. <br /> <br />Items 1 and 2 were recommended in Reclamation's 1981 <br />tion report where "action is needed to prevent or reduce <br />damage or preclude operational failure." The District <br />reserving $12,500 per year in 1982 to perform the repairs. <br /> <br />inspec- <br />further <br />began <br /> <br />Replacement of the deteriorated riprap on the dam was <br />suggested due to what appeared to be exposed Zone 2 material on <br />the upstream face of the dam. An examination by Reclamation in <br />1984 concluded that the exposed material was not Zone 2 but was <br />road surface material from the dam crest that had washed down the <br />embankment. For this reason, Reclamation has withdrawn the <br />recommendation that the riprap be replaced. The riprap repair <br />component has been deleted from the Lemon Dam Project. <br /> <br />4.0-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.