My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00527
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0024X
Contractor Name
Florida Water Conservancy District
Contract Type
Loan
Water District
0
County
La Plata
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />irrigation months (October-April). The irrigation releases <br />Usually peak in June and July at about 270 cubic feet per second <br />(cfs) except in above average runoff years in which case the <br />releases can be as high as 910 cfs. The releases begin at about <br />100 cfs in the spring, rise to the 270 cfs peak, and then gradu- <br />ally decrease to about 70 cfs in the fall. <br /> <br />The winter releases are in the 9 cfs to 13 cfs range and are <br />made to provide water for the river fishery as well as for the <br />city of Durango which diverts water from the Florida River. <br />Durango can require that the inflow into the reservoir, up to 8.92 <br />cfs (Durango's senior diversion right), be released from the dam. <br />If the inflow is less than 8.92 cfs, Durango is entitled only to <br />the amount of the inflow. <br /> <br />The Florida Project has operated successfully for over 20 <br />years with only minor problems. The darn and facilities are <br />generally in excellent condition with the exception of the outlet <br />gates. These gates are currently leaking an aggregate of 0.25 cfs <br />and need to be repaired. <br /> <br />2.0-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.