My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153314 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153314 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2010 8:48:20 AM
Creation date
10/5/2006 11:59:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153314
Contractor Name
Parachute, Town of
Contract Type
Loan
Water District
45
County
Garfield
Bill Number
SB 78-69
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Form (,-he.02A <br /> <br />cal' <br />Co <br /> <br />lie <br />DEI' by !NT OR AGENCY NUMlli'.R <br />, R, <br />, 4-04-00 <br />CONrRA 'T ROUTING NlJMIIER <br />,,~~)' D <br /> <br />J'O,i2/ <br /> <br />$247,800.00 <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made thi:o 1st day of~tember 197.2., by and between the <br />Slate of Colorado for thl! use and ben(lfll of Ih. Dopbrtnllllll of "1 Ni:\t..u,r"l- Re6ourCl~&:I <br />(Colorado wa~er conservation Board) <br />hereinafter referred to as the Statej and'2 the Town of Grand Vallev, <br />P. O. Box 217. Grand Valley. Colorado 81635 <br />hereinafter referred to as the contJilctor. <br /> <br />WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise made <br />availahle and a sufficient unellcum~ered balance thereof remains available for payment in Fund.Number 4008 . <br />G/L Account Number 576,27 , Contract Encumbrance NnlllberCI.r.~l/Y ; and <br /> <br />WHEREAS, re{luired approval, clearance and coordination has befll accoml'lished from and with apprnpri<lte <br />agencies; and <br /> <br />WHEREAS, 'Jpursuant to Title 37, Article 60, Colorado Revised <br />statutes 1973, as amended, the state, through the COlorado Water <br />Conservation Board, ~ay construct water resource projects and make <br />the waters available therefrom to the residents of the state of <br />Colorado upon condit~ons to be determined by the Colorado Water <br />Conservation Boardi .~nd <br /> <br />WHEREAS, the cont~actor is a duly constituted incorporated town <br />of the state of colo~ado and wishes to undertake construction of a <br />domestic water syste~ hereinafter called the project, for the Grand <br />Valley Community in Garfield County, Colorado, at an estimated cost <br />of Five Hundred Thou@and Dollars ($500,000), and <br /> <br />WHEREAS, a feasib;i.lity investigation of said project was COIl- <br />ducted and it was fo~nd that such a project is economically fCRsible; <br />and <br /> <br />WHEREAS, the Stat~, through the Colorado Water Conservation Board, <br />has agreed to constrllct said project and..to seLl the same to the <br />Contractor upon mutucLlly agreeable terms and conditions, subject to <br />the approval of appropriations for that purpose by the Colorado <br />General Assembly and the Governor of the State pf Colorado; and <br /> <br />WHEREAS, pursuant to Senate Bill No. 69, Fifty-Second General <br />Assembly Of the state of Colorado, duly enacted by the ColoradO <br />General Assembly and approved by the Governor ot the State of Colorado, <br />there was appropriated to the COlorado Water coDservation Board the <br />sum of Two Hundred Fifty Thousand Dollars ($250,000) for construction <br />of the Grand Valley project; and <br /> <br />WHEREAS, the Contractor has available from ii:'-S own sources nnd <br />from a grant approved by the Office of the Socio-Economic Impact Co- <br />ordinator sufficient funds to construct the rem~inder of the project; <br /> <br />NO\v, THEREFORE, in consideration of the mutu~l and dependent <br />covenants hereirt contained, it is agreed by the parties hereto as <br />follows: <br /> <br />A. The Cont~~ctor a~ that it will: <br /> <br />1. Cause the construction of said project ~o be completed within <br />two (2) years of the date of this contract in aCcordance with the <br />project plans and specifications and any necess~ry mOdification thereof <br />approved by the state. No payment will be made under this contract <br />until the project plans and specifications are ~pproved by the state. <br />The above-mentioned time may be extended by the state if such time is <br />insufficient because of acts of God or other ac~s Or circumstances <br />beyond the control of the Contractor. <br /> <br />Page 1 of ~ pages <br />*(SeeinslluctioPsoP'levcncoflasl page.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.