Laserfiche WebLink
<br />Table 6 - 5 <br />Other Project Costs <br />Douglas Dam Rehabilitation Construction <br /> <br />Feasibility Report <br /> <br />$20,000 <br /> <br />Geotechnical Investigation <br /> <br />$18.000 <br /> <br />Spillway Redesign and <br />Hydraulic Structure Evaluation <br /> <br />$7,000 <br /> <br />Design Report <br /> <br />$9,000 <br /> <br />Plans & Specifications <br /> <br />$28,000 <br /> <br />Total <br /> <br />.......~82.999.... <br /> <br />= <br /> <br />Woodward.Clyde Consultants <br />