Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />106 ELM STREET <br /> <br />IRRIGATION OFFICE <br /> <br />P.O. BOX 206 <br />EATON. COLORADO 80615 <br /> <br />TELEPHONE 454.3377 <br /> <br />Larimer & Weld Irrigation Co. <br />Larimer & Weld Reservoir Co. <br />Windsor Reservoir & Canal Co. <br />Owl Creek Supply & Irrigation Co. <br />Cache La Poudre Water Users Ass'n. <br />Divide Canal & Reservoir Co. <br /> <br />Lucas Lateral Ditch Co. <br />Town Boyd Lateral Co. <br />For Far Lateral Co. <br />Gale Lateral Co. <br />West Irrigation Co. <br />Decker Lateral Co. <br />Graham Lateral Co. <br /> <br />December 14, 1990 <br /> <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br /> <br />Attention: Mr. David Walker <br />Director <br /> <br />Re: Feasibility Study for Rehabilitation of Douglas Dam <br /> <br />Dear Mr. Walker: <br /> <br />The Windsor Reservoir and Canal Company is hereby transmitting to the <br />Colorado Water Conservation Board (CWCB) the attached feasibility report for <br />the rehabilitation of Douglas Dam. This feasibility report presents the <br />study conducted as part of the Windsor Reservoir and Canal Company's <br />application to the CWCB for financing one-half of the rehabilitation <br />construction cost. <br /> <br />The Attached report has been prepared according to the Guidelines for <br />Assistance through the Colorado Water Conservation Board Construction <br />Fund. All the required documents have been included in the report and <br />appendixes. The geotechnical and hydrological design report is included <br />in a draft form in Appendix E, as this report will not be finalized until <br />late December, 1990. <br />