My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00518
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153484
Contractor Name
San Luis Valley Water Conservation District
Contract Type
Grant
Water District
0
County
Rio Grande
Bill Number
FSG
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />II <br />'I <br /> <br />same year and perhaps used more efficiently by existing diversion <br /> <br />I <br /> <br />structures. <br /> <br />River Basin Modeling <br /> <br />I <br /> <br />I <br /> <br />The 1948 through 1985 period was selected as the historic hydrologic period for <br /> <br /> <br />use in the river basin modeling. This period was selected based on statistical <br /> <br /> <br />analyses and other factors including data availability, public perception, and <br /> <br /> <br />inclusion of drought periods. <br /> <br />I <br /> <br />I <br /> <br />The computer model used for the storable flow analyses was the RIver Basin <br /> <br />SImulation Model (RIBS 1M) which allocates flow on a monthly basis by the prior <br /> <br />appropriation doctrine. <br /> <br />Modifications were made to the model to incorporate <br /> <br />I <br /> <br />features such as administration of Rio Grande water rights, the Rio Grande <br />Compact and the Closed Basin Project. <br /> <br />I <br /> <br />The primary data generated for the modeling effort consisted of: <br /> <br />I <br /> <br />1. <br /> <br />a flow base containing monthly flows at various locations along the <br /> <br /> <br />river on which to superimpose the modeled features of the basin. <br /> <br /> <br />The flow base was generated by adjusting 1948 through 1985 gaged <br /> <br /> <br />flows in the basin to remove the effects of man made structures <br /> <br /> <br />included in the modeling. <br /> <br />, I <br /> <br />I <br /> <br />I <br /> <br />2. <br /> <br />a water user network which contains information on how the model <br /> <br />is to operate the modeled features. <br /> <br />This network contains such <br /> <br />I <br />II <br /> <br />information as the location, priority, constraints, and return flow <br /> <br /> <br />characteristics for each diversion. Additional information such as <br /> <br />starting contents. area-capacity curves and evaporation rates are <br />included for each modeled reservoir. <br /> <br />I <br /> <br />A process (called calibration) of checking and adjusting the model to reasonably <br /> <br /> <br />match a historical record of diversions and streamflow yielded a model suitable <br /> <br /> <br />for the storable flow determinations. The 1950 through 1967 period was chosen <br /> <br />I <br /> <br />I <br /> <br />viii <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.