My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00516
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153039
Contractor Name
Rangely, Town of
Contract Type
Grant
Water District
0
County
Rio Blanco
Bill Number
Xb 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />previous defaults by the Contractor, through judicial proceedings <br />to require _specific performance of this contract or by such other <br />,proceedings !n law or equity as may be deemed necessary by the <br />State to insure compliance with provisions of this contract and <br />the laws an~ ,regulations under which this contract is made. <br /> <br />B. The State agrees that it will: <br /> <br />.: 1. Make available to the Contractor for the purpose of this <br />contract the sum of Five Hundred Eighty-One Thousand Five Hundred <br />Thirty Doll a,s ($581,530). Said Five Hundred Eighty-One Thousand <br />Five Hundred Thirty Dollars ($581,530) shall be made available to <br />the Contractor in accordance with the following tenns, schedule <br />and'conditions: <br /> <br />a, Beginning with the monthly period commencing July 1, 1976, <br />and for every month thereafter until said project has been <br />completed, the Contractor shall prepare an estimate of the <br />funds required from the State for project construction during <br />that month and shall forward said'estimate to the State not <br />less than fifteen (15) days prior to the beginning of such <br />month. <br /> <br />b. Upon receipt and approval by the State .of such monthly <br />estimate, the State will, within thirty (30) days from the <br />receipt of such estimate, pay over to the Contractor the <br />amount of the monthly estimate or such portion thereof as has <br />been approved by. the State. <br /> <br />2. Assist the Contractor with such technical assistance as the <br />State deems appropriate in' planning, constructing, and operating <br />the project and in coordinating the project with local official <br />comprehensive plans for sewer and water and with any state or <br />area plans for the area in which the project is located. <br /> <br />3. . In. its sole discretion, the State may at any time give any <br />consent, deferment, subordination, release, . satisfaction, or <br />tennination.of any or all of the Contractor's obligations under <br />this agreement, with or without valuable consideration, upon such <br />terms and conditions as the State may determine to be (a) advisable <br />to further the purposes of this contract or to protect the State's. <br />financial interest therein, and (b) consistent with both the <br />s~atutory purposes of this contract and -the limitations of the <br />. statutory authority under which it is made. <br /> <br />4. Upon completion of. the payment of the full purchase price to <br />the State in the sum of Nine Hundred Eighteen Thousand Three <br />Hundred Sixty Dollars ($918,360) as set forth in paragraph A. 9. <br />of this contract, to convey to the Contractor all of the State's <br />right, title and interest in and to the project by deed or other <br />prop~r conveyance. <br /> <br />Page .3 of 5 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.