My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00515
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:03 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0019X
Contractor Name
Turkey Creek Snowball Creek Project CWRPDA 1985
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />the assumptions discussed in Table 4.1, only the right-of-way from Station <br />47+20 to Station 80+00 and from Station 122+00 to Station 162+50 would have <br />to be purchased. This totals 5.02 acres. <br /> <br />TABLE 4.1 - Property Ownership Along the Road and Pipeline Right-of-Way <br /> <br /> ESTIMATED <br />STATION OWNERSHIP ACREAGE (Acres) <br />0+00 to 47+20 Forest Service <br />47+20 to 80+00 Hershey 2.23 <br />80+00 to 122+00 Forest Service <br />122+00 to 162+50 Hershey 2.79 <br />162+50 to 219+80 Hershey 3.95 <br />219+80 to 231+30 Wilsey .79 <br />231+30 to 237+75 Hyde .44 <br />237+75 to 259+00 Macht Ranch, Inc 1.46 <br /> <br />4.4.2 <br /> <br />Right-of-Way for Dam and Reservoir Basin <br /> <br />The maj ority of the dam and reservoir basin lies on land owned by <br />Macht Ranch, Inc. Since this land is important to the Macht's ranching <br />operation, it was assumed that only land encompassed by a 300-foot <br />horizontal boundary beyond the normal water surface would be obtained for <br />the project. The total private acreage to be obtained is 95 acres based on <br />a 2,900 acre-foot reservoir. Approximately 97 acres of Forest Service land <br />would be required. <br /> <br />4.4.3 <br /> <br />Canal Right-of-Way <br /> <br />Approximately 4,200-feet of canal would be enlarged. This enlargement <br />would extend from the diversion structure in Turkey Creek to the headwaters <br />of Snowball Creek. Once the flow enters Snowball Creek, the remaining <br />distance to the reservoir depends on gravity flow. Approximately <br />1,OOO-feet of the canal is located on Macht Ranch Inc.' s, property. In <br />addition to the canal, a maintenance right-of-way for access to the canal <br />and along the creek bed to the reservoir should be obtained. If a 30-foot <br />wide easement is purchased, the total acreage for access and the canal is <br />2.4 acres. <br /> <br />4-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.