My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00514
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:59:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153160
Contractor Name
Ridgeway, Town of
Contract Type
Grant
Water District
0
County
Ouray
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Form n..\('.02^ <br /> <br />, <br />......>;>:.1 <br /> <br />. <br /> <br />1)-- <br />, <br />U1'.i~'U:Nl' OR M;ENCY N <br />34- 04- 00 <br />CONTRACT ROUTING NUMBER <br />4812 <br /> <br />$ 7 ,600 <br /> <br /> <br />-;, <!JJ.t~, .,,,", '" '" :'mcr ,=. ",1,", "..,__ ,. <br />Stale or Colorado ror the use and benefit or the Department of'1 Natural Resources <br />(r.o1orado Water r.onservation Hoard) <br />hereinafter rcCerred 10 as the State. and'2 Mp-sa Rngineering and Surveying Co.. <br />P 0 Rox 1287, Montrosp-, r.olorado 81401 <br />hereinafter referred to as the contractor, <br /> <br />WflEREAS, authority exists in the Law and Funds have been budgeted, appropriated and otherwise rJ4de <br />available and a suHicient unencumbered balance thereof remains available for payment in Fund Number q DOlt . <br />G/L Account Number 52207, Contract Encumbrance Number C]1)3160 ; and <br /> <br />WHEREAS, required approval, clearance and coordination has been accomplished rrom and with appropriate <br />agencies; and <br /> <br />WHEREAS. "pursuant to the provisions of 37-60-119, Colorado <br />Revised Statutes 1973, as amended, the Colorado Water Conservation <br />Board is authorized to construct certain water projects for the <br />benefit of the people of the State of Colorado; and <br /> <br />WHEREAS, the Town of Ridgway has made application to the Colorado <br />Water Conservation Board for the construction of a water project for <br />the purpose of improving its municipal water supply; and <br /> <br />WHEREAS, the Contractor is a professional engineering firm within <br />the State of Colorado and has previously done considerable water- <br />related work for the Town of Ridgway and various other municipalities <br />in Colorado; <br /> <br />NOW THEREFORE, it is hereby agreed that <br /> <br />1. The Contractor agrees to prepare a feasibility report directed <br />to the problem of improving the municipal water of the Town of Ridgway <br />in accordance with a proposal for project feasibility report prepared <br />by the Contractor and approved by the Colorado Water Conservation <br />Board. received May 11,1977, which proposal is attached hereto as <br />Appendix A and made a part of this contract. <br />-. <br /> <br />copies of the report called for in <br />the State not later than August 1, <br />by mutual agreement of the parties <br /> <br />2. Fifteen (15) <br />shall be furnished to <br />such time is extended <br /> <br />this contract <br />1977, unless <br />hereto. <br /> <br />3. As compensation for the services of the Contractor, the State <br />agrees to pay the Contractor the sum of Seven Thousand Six Hundred <br />Dollars ($7,600) in the manner following: <br /> <br />a. Sixty percent (60%), to wit, Four Thousand Five Hundred <br />Sixty Dollars ($4,560) of the total amount due in two (2) monthly <br />installments of Two Thousand Two Hundred Eighty Dollars ($2,280) <br />each, commencing on July 15, 1977. <br /> <br />b. The remaining forty percent (40%), to wit, Three Thousand <br />Forty Dollars ($3,040) within thirty (30) days following receipt <br />and acceptance of the written report specified in paragraph 2 of <br />this contract. <br /> <br />4. This contract is personal in nature and assignment of <br />performance by the Contractor to another is prohibited unless prior <br />approval in writing is granted by the State. <br /> <br />5. The Contractor is an independent Contractor and as such is <br />not entitled to any benefits of the State personnel system. <br /> <br />Page I oflpages <br />.(See instruclions on reverse of lul page.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.