Laserfiche WebLink
<br />" <br /> <br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board approval of engineering firm and engineering <br />agreement between engineering firm and project sponsor. <br /> <br />2. Preparation of detailed plans and specifications fOL' <br />authorized projects by conSUlting engineering firm. <br /> <br />3. Approval of detailed plal1s and speci fications by Board <br />staff (plans and specifications for storage dams and <br />reservoirs must also be approved by State Engineer's <br />office) . <br /> <br />4. <br /> <br />Board staff app.coval of bidding for the p.coject. <br />staff present at bid opening faL" construction. <br /> <br />BaaL"d <br /> <br />5. PL"oject sponsoL" may issue the notice of award an<i the <br />notice to pL"oceed with construction to the contracto.c <br />(both notices must be approved by the Board staff before <br />they are issued). t.' <br />.. <br />I <br />6. Conduct a pre-construction conference. Approval of <br />constL'uction scheoule by BoaL'd staff. <br /> <br />7. ConstL'uction commences. The BoaL'o staff makes pe,ciorlic <br />inspections during const.cuction. All change oL"deL-S must <br />be approved by the BoaL'd staff in advance and befoL4e any <br />constL"uction on change items can conunence. EmeJ.:gency <br />items cleaL'ed by telephone. <br /> <br />B. The consulting engineer ce.ctifies that the project has <br />been completed according to app.coved d.cawings and <br />specifications and arranges for final inspection. <br /> <br />9. Final inspection and acceptance of as-built pl..oject by <br />Boa.cd staff. <br /> <br />10. Submittal of as-built d.cawings to Board staff for <br />approval and filing. <br />