My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153664 Engineering report
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153664 Engineering report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:59:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153664
Contractor Name
Fort Lupton, City of & Fort Lupton Water Utility Enterprise
Contract Type
Loan
Water District
1
County
Weld
Bill Number
HB 93-1273
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />capacIty 1Il the P1pel1ne pursuant :0 L'le procedures set .Jut m parag~,~'1 <br />8.b.!. below. and L'le Allottee shall have :10 fun.'ler obl1gauon [0 pay suc:, <br />StUDS or addltional future sums related to the lost poruons of Its allotted. <br />capacIty. <br /> <br />iv. The SWSP Enterpnse shall deposIt all funds pro\1ded by the Allottee <br />pursuant to par~raphs 6.b.. 6 b.!.. 6.b Ii. and 6.b.:!1. abo\'e m an <br />interest bearing account and shall pay the interest ear.-.ed on Sald :'ur.ds <br />to the Allottee on a quarterly bas15. <br /> <br />v. ..1Jlottee ~rees to make payment of. pursuant to the procedures set:ut <br />m paragraph 8.a. below and subject to paragraph 8.b. belew. its share :f <br />annual charges and costs lIlcurred by the SWSP Enterpnse :n L'le <br />administration. operation. maintenance. repalr. and replacement of tile <br />PlpeUne and such other annual costs as may arise from and be <br />attI1butable to the operation of the Pipeline. <br /> <br />vi. Allottee agrees to make payment of. pursuant to the procedures set out <br />In paragraph 8.a. below and subject to paragraph 8.b. below. Its share of <br />such an annual amount as the Board shall determine to be necessary to <br />establish and maintain an operating and maintenance reserve fund <br />equal to eighteen months operating and maintenance charges and costs. <br /> <br />c. The payments descnbed In this paragraph 6 and In paragraph 8 below are full <br />payment for all water delJvery services to be provided to Allottee under this <br />Contract. No other charge. fee. tax. or levy for the PtpeUne or the use thereof. <br />shall be made to Allottee or Its citiZens. directly or Indirectly by SWSP <br />Enterprise; except for any fees. charges or assessments charged or le\ied by :..::e <br />DIstI1ct or Subd1stI1ct In connection With alloonent contracts for DIStI1ct water <br />or Subd1sOict water or inclusion of the Allottee or Its land area Within the <br />boundartes of the DlstI1ct or Subd1stI1ct. or taxes charged or levied by the <br />DIstI1ct or Subd1stI1ct on lands Included Within the DlstI1ct or SubdlstI1ct. <br /> <br />d. All money paid to the SWSP Enterpr1.se by the Allottee under this Contract shall <br />be kept In separate accounts from all other accounts of the SWSP Enterprise or <br />the DIstr1ct and shall be used only for PlpelJne purposes as specified In this <br />Contract. <br /> <br />7. F'ttm~ted D..m~n.d and DelJverv Schedule. CommenCing In the year In whIch <br />the PlpelJne becomes operational and on or before December 1 of each year thereafter. Allottee <br />shall provide the SWSP Enterprise With an estimated demand and del1very schedule for the <br />use of Its capadty. not to exceed the amount allotted herein. for the follOWIng calendar year. <br />This schedule shall contain the time and quantities of water whJch Allottee esumates It shall <br />require to be transmitted by the PlpelJne. nus schedule may be mod1fled by the Allottee from <br />ume to time as the need warrants. In Its sole dlscretion. Within the physical capabilities of the <br />PlpeUne. <br /> <br />8. Payment of Charll:es. <br /> <br />a. Payment of the costs for annual administration. operation and maintenance. <br />Including repalr. shall be the responsibility of the PartJclpants which shall be <br />allocated on the same percentages which determine each PartJcipant"s <br />Construction Costs. Including the Allottee's Construction Costs as set forth on <br />Schedule B. :'/0 later than three 13) months pnor to the completion of <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.