Laserfiche WebLink
<br />\~~ <br />i' <br />,\l)\: <br />" , <br /> <br />,~ Fol'tll t>.AC-02A IR ~/1I51 <br />NFRPB <br /> <br />/{C/7//01 <br /> <br />C-/~:")17c. <br /> <br />C; '>Is/. <br />PROJECT <br />CONTRACT <br /> <br />UEP,' ,:r-; r OK ,\Gt::."C'r' ....U.\IB~R <br />-4-04-00 <br />CO~T",\cr ROUTlN(j [\;tJ~18fN. <br />'2 .1 <br />$300,000 <br /> <br />THIS CONTRACT. made Ihis 1st day of December 198 ~ . by and between the <br />Slate of Colorado for the U~e and benefit of tile Department of . 1 Natural Resources <br />(Colorado Water ConserVation Board). <br />hereinafler rt'ferred to as the Slale, and '2 the Farmers Extension Ditch Company and the <br />Highland Lake Lateral Ditch1X)mpany, P. o. Box 550, Johnstown, CO 80534, <br />hereinafler referred to a~ the conltaclor. <br /> <br />WHEREAS, authority exists in the law and Funds have been budgeted, appropriated and otherwise made <br />available and a sufficient unencumbeted balance thereof remains a~i~ble for payment in Fund Number 4008 <br />C/l Account Number 5318X . Contract Encumbrance Number 11471,,: and <br />ABL Account Number 13187, Org. Unit 77-77-777, . <br />WHEREAS. re4uirl'd approv,,!. clearance and coordinatiun has been accomplished from and with appropriate <br />agencies: and <br /> <br />WHEREAS. purSUant to the provisions of 3/-60-119. Colorado <br />Revised Statutes. the State is authorized to loan money for the <br />construction of water projects for the benefit of the people.of <br />the State; and <br /> <br />WHEREAS. purSUant to Senate Bill No. 67, the Fifty-Second <br />General Assembly Of the State of .Colorado authorized the State <br />to loan a sum not to exceed One Million Two Hundred Thousand <br />Dollars ($1.200.000) to the Contractor for. the Contractor1s use <br />in performing c~rtain repair work on its irrigation system. <br />which work is referred to hereinafter as lithe project..: and <br /> <br />WHEREAS, the Qontractor has performed the project in <br />phases, and has previously completed five phases of the <br />project. for whic~ phases the State has loaned the Contractor <br />to date Nine Hundred Fifty-Five Thousand Dollars ($955,000), of <br />which amount the Qontractor has expended to date Nine Hundred <br />Twenty-Seven Thou~and Three Hundred Thirty-Three Dollars <br />($927.333); and <br /> <br />WHEREAS. Two ~undred Seventy-Two Thousand six Hundred <br />Sixty-Seven Dollars ($272,667) remains unspent from the <br />oriqinal $1,200,000 appropriation. and said $272.667 is <br />available to be l~aned to the Contractor for completion of the <br />sixth phase of th~ project: and <br /> <br />/1 <br /> <br />WHEREAS. Senate Bill No. 67 provided that the amount <br />authorized for lOqns of this type could be increased by such <br />amounts as are jU~tified by reason of ordinary fluctuations in <br />construction cost~ as indicated by engineering cost indices <br />applicable to thi~ type of work; and <br /> <br />WHEREAS. purs~ant to Senate Bill No. 67, the state has <br />determined that t4e amount available to be loaned for the total <br />project should be increased by Five Hundred Ninety-Seven <br />Thousand Six Hundred Twenty-Three Dollars ($597,623). to a <br />total of One Million Seven Hundred Ninety-Seven Thousand six <br />Hundred TWenty-Three Dollars ($1.797,623). and of the <br />additional $597,6~3 required, the sum of Twenty-Seven Thousand <br />Three Hundred Thirty-Three Dollars ($27.333). as well as the <br />$272.667 remaining from the original appropriated amount. is <br />available to be loaned for completion of the sixth phase of the <br />project: and <br /> <br />WHEREAS. the State has now agreed to loan the Contractor <br />Three Hundred Tho~sand Dollars ($300.0DO) for completion of the <br />sixth phase of the project. the total cost of which phase will <br />be six Hundred Thousand Dollars ($600.000); <br /> <br />J<J5-5J{)....IO.14 <br /> <br />Page I of ~ \la~es <br />*(Scc inslrucliun~ un rCH'r,c tll 13.\1 p3ge.1 <br /> <br />1714E <br />