My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153755 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153755 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 12:57:11 PM
Creation date
10/5/2006 11:58:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153755
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Water District
24
County
Costilla
Bill Number
SB 92-87
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />J' <br />Ir <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />,< <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />--- <br /> <br />Please attach the fallowing to your Sanchez Ditch and <br />Reservoir Company By-Laws pamphlet. <br /> <br />\ <br />, <br />, <br /> <br />Amended By-Laws March 6, 1991 <br /> <br />Article IX, Section <br /> <br />(i) To require a stockholder to bear the expense of <br />that stockholder's actions or inactions which result in <br />physical damage to or maintenance problems with respect <br />to any property owned or maintained by the Company, <br />including, but not by way of limitation, Company ditches. <br />canals, laterals. clllverts. weirs, or other pronerty. <br />In the event that the CO~lpa[lY determines that sllch <br />additional maintenance or repair expenses have been <br />iJ1CUrred. written notice tllereof together with a l)ill <br />for the [l m 0 u n t 0 f sue hex p e 11 s C 5 S h all h c ~ II h mil: r c (I t () <br />tile. stocklloldcr. The wateruser/sL()ckholder lnay n!'jlcnl <br />this matter to the Appeal Board within fifteen days of <br />notice. The Appeal BORrd shall render a decision with- <br />in fifteen days of notice of appeal, and the Cl!TI0l111l <br />if so decided by the Appeal Board, shall be due and pay- <br />able in full within fifteen days of ~he date of the <br />Appeal Board ruling. The Appeal Board shall be comprised <br />of one Board member and the By-Laws Committee. No Appeal <br />Board member shall sit on said committee if committee <br />member is the objector. In the event that such amOtlIlt is <br />not paid by a stockholder within thirty days. the Company <br />shall have all of the same powers which it has with regard <br />to unpaid assessments, includi~g, but not by way of <br />limitation, the right to withhold the delivery of water, <br />the right to refuse to transfer certificates of stock, <br />the right to assert a lien against the stock of the <br />stockholder for the amount due and owing, and the right <br />to bring an action at law for the recovery of the amounts. <br />In the event the amount is not paid within thirty days, <br />the stockholder shall also be responsible for any resonablc <br />attorneys fees and costs incurred by the Company as result <br />of such nonpayment. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.