My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153755 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153755 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 12:57:11 PM
Creation date
10/5/2006 11:58:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153755
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Water District
24
County
Costilla
Bill Number
SB 92-87
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />1 <br />1 <br />1 <br />I <br />I <br />1 <br />1 <br />I <br />I <br />1 <br />1 <br />1 <br />I <br />I <br />1 <br />1 <br />1 <br />1 <br /> <br />~~ Smith <br />d~ Geotechnical <br />ENGINEERING CONSULTANTS <br /> <br />August 6, 1997 <br /> <br />Mr. John Van Sciver, P,E. <br />Colorado Water Conservation Board <br />1313 Sherman Street <br />Denver, CO 80203 <br /> <br />Re: Sanchez Reservoir Valve Repair and Replacement <br /> <br />Dear Mr. Van Sciver: <br /> <br />On behalf of the Sanchez Ditch and Reservoir Company, Smith Geotechnical is herewith transmitting the <br />revised feasibility study for the repair and replacement of valves in the Sanchez Reservoir gate tower. The <br />feasibility study was conducted as part of Sanchez Ditch and Reservoir Company's application to the Colorado <br />Water Conservation Board to obtain financing for the above referenced project. <br /> <br />The attached report has been prepared in accordance with the Colorado Water Conservation Board Guidelines <br />for small projects as modified by CWCB personneL <br /> <br />With the submittal of this report, the Sanchez Ditch and Reservoir Company formally requests funding for the <br />project from the Colorado Water Conservation Board Construction Fund as follows: <br /> <br />1) 100 percent funding of the first $200,000 of the project costs, This $200,000 is the remaining balance of <br />a 1992 loan granted to Sanchez Ditch and Reservoir Company for repairs to the Sanchez Reservoir Dam. <br /> <br />2) 75 percent funding of an additional $180,000 of the project costs, <br /> <br />The total project cost for the alternative chosen by the Sanchez Ditch and Reservoir Company Board of <br />Directors is approximately $380,000, Your consideration and approval of this funding will be greatly <br />appreciated, <br /> <br />Sincerely, <br />SMITH GEOTECHNICAL/Engineering Consultants <br /> <br />r7~~ ~ <br /> <br />Ron Slosson, E.LT, <br /> <br />1225 Red Cedar Circle, Suite H . Fort Collins, CO 80524. (970) 490'2620 . FAX (970) 490,2851 <br />
The URL can be used to link to this page
Your browser does not support the video tag.