My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153755 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153755 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 12:57:11 PM
Creation date
10/5/2006 11:58:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153755
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Water District
24
County
Costilla
Bill Number
SB 92-87
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />1 <br />I <br /> <br />The 30-inch fixed cone valve will have a discharge capacity of approximately 250 cfs. The new <br />knife gate valves will have slightly better flow characteristics than the wedge gate valves they are <br />replacing. Discharge capacities of the existing two 48-inch valves and the existing three 30-inch <br />wedge gate valves will remain unchanged. The net results of all repair and replacement is an <br />increase in discharge capacity. <br /> <br />In addition to valve repair and replacement, the company intends to remove all non-functional <br />ladders and walkways and replace them with new ladders, walkways and a fall protection system. <br />These improvements will facilitate inspection and maintenance of the gate tower. <br /> <br />WATER RIGHTS <br /> <br />The company's decreed water rights and appropriations begin in 1856 and go through 1934 for <br />a cumulative total of 373.950 cfs. A list of the company's water rights are shown in the following <br />table. <br /> <br />Sanchez Ditch and Reservoir Company Water Rights <br /> <br />PriorIty Dit"h Name <br />8 San Acacio <br />42 Island <br />60,61 Culebra-Eastdale No, I <br />1934-4ST Sanchez Res. Storage Priority <br />1934-11 Culebra-Eastdale No. I <br />1934-5ST Sanchez Res. Storage Priority <br />1934-21 Culebra-Cerritos <br />24 Cordillera <br /> Total <br /> <br />De"reed cfs <br /> <br />23.250 <br />1.500 <br />48.625 <br /> <br />228.075 <br /> <br />37.500 <br /> <br />,5000 <br /> <br />373.950 <br /> <br />Appendix B contains a complete list of priorities and the Sanchez Ditch and Reservoir Company's <br />position on the priority list. Appendix C contains the deed listing all water rights acquired form <br />The San Luis Power and Water Company. <br /> <br />6 <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.