My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00509
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153500
Contractor Name
San Miguel Water Conservancy District
Contract Type
Loan
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE IH <br />DITCH COMPANY ORGANIZATIONS AND FACILITIES <br /> <br /> Service Number of <br />ComnoL:." Area '!\me "hareholders Facilities <br />Farmers' , l~ater Norwood- Non-Profit 141 Intake ditch-IS mi., <br />Developm ht Company Redvale Corporation Gurley Reservoir-lO,040 af, <br /> (Wright's Mesa) Distribution ditches-IS mi. <br />Lone Con Ditch & Norwood Non-Profit 37 Intake ditch-l1.3 mi., <br />Reservoir ompany Corporation Cone Reservoir-l,800 af, <br /> Distribution ditches-5.5 mi. <br />Lilylands ( ~nal& East Lilylands Mutual Ditch 6 Intake ditch-1.6 mi., <br />Reservoir ' ompany Dry Creek Compahy Lilylands Reservoir-700 af, <br /> Distribution canal-18 mi., <br /> Lateral canals-16 mi. <br />J &MHu hes Ditch Beaver Mesa Privately Owned 1 Intake and Distribution <br /> ditches-20 mi. <br /> <br />The SMW ,D was originally formed in 1957 for the purpO!!eS of acquiring conditional water rights and to act as <br />the contra ting and administrative agency for operation of the San Miguel Project. At the time of district <br />formation, the San Miguel Project was being planned by the U,S. Bureau of Reclamation (USBR) for federal <br />constructi n as a participating project under the Colorado River Storage Project Act. Federal involvement in the <br />San Migue 'Project was discontinued in 1981. Since 1981, the SMWCD has undertaken planning activities for a <br />non-feder 'project to be financed, in part, by the CWC~ upon a finding of technical and financial feasibility. <br />, , <br />During th i course of this study, representatives of each o~ the ditch companies have served as a study advisory <br />group for t 'chnical review sessions with the engineering consultant. <br /> <br />XI-3 <br /> <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.