Laserfiche WebLink
<br />To investi! 'te alternatives for increasing the late season water supply for the study area, it was necessary to <br />determine he availability of water to a project and the croll water demands to be served. Water availability was <br />determine !through analyses of water rights and of historical flows (hydrology). Water demands were determined <br />through an~lyses of cropping patterns, irrigation delivery artd application methods, and municipal and industrial <br />. , <br />(M & I) de hands. <br /> <br />Develonme t of Alternatives <br /> <br />. . <br />. . <br />Improving *nd expanding the existing irrigation systems in t~e study area to provide additional late summer water <br />supplies c( lid be accomplished in a number of different !ways. Four alternative project configurations were <br />developed ~d are designated as Alternatives G, L, Hand W. Alternatives G and L were formulated so they <br />could func ion independently or be combined with additiqnal elements to form Alternative H. Alternative H <br />combined 1{ith additional elements comprises Alternative W, the maximum alternative considered. This <br />formulatio ' allows flexibility so that an alternative selected !Iue to financing constraints could be expanded into a <br />larger alter, ative when additional financing becomes available. A description of each of these alternatives follows: <br />, . <br />I <br /> <br />Alternativtl,(t. The Gurley and Cone collection and regulatpry systems with increased storage at Cone Reservoir, <br />stream div rsion improvements and a Gurley Ditch to Cone i Reservoir connection. <br /> <br />Alternativ 'L . The Lilylands Canal and Reservoir system with an enlarged reservoir and extension of the <br />Lilylands I take east of West Naturita Creek. <br /> <br />i <br />I , <br />Alternativ iH - The combined and interconnected Gurley, Cone and Lilylands systems incorporating the features <br />~ ; <br />of both Al ernatives G and L with additional elements a1l9wing the transfer of excess Gurley-Cone water to the <br />Lilylands a ea. <br /> <br />Alternativ i W . This alternative includes all of the elem~nts of Alternative H with the addition of increased <br />capacity in ' & M Hughes Ditch and a new reservoir at the Marie Scott site on Saltado Creek. <br />: <br /> <br />In additio to the project features discussed above, Radiun). Reservoir and the San Miguel Canyon Project could <br />be added s options to some of these alternative project c(mfigurations. Radium Reservoir, a proposed wildlife <br />habitat an ,recreational reservoir in the Dry Creek Basin, i$ an optional addition to Alternatives L, H or W. The <br />I <br /> <br />vi <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />