Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TOWAOC MUNICIPAL PROJECT <br />FEASIBILITY REPORT <br /> <br />1.0 INTRODUCTION AND GENERAL INFORMATION <br /> <br />1.1 General <br /> <br />The Towaoc Municipal Project consists in part of the design and construction <br />of a water supply pipeline of approximately 20 miles in length to serve the <br />Town of Towaoc on the Ute Mountain Ute Reservation in southwestern Co1oratio. <br />In addi ti on, improvements are to be made to the water di st..; buti on system <br />within Towaoc. <br /> <br />Tl1e general location of the project is shown in Figure 1. The pine1ine will <br />convey water by gravity from the Cortez water treatment plant about four miles <br />northeast of Cortez to the Town of Towaoc whi ch is located approximate1 y 15 <br />miles southwest of Cortez. The entire alignment will be within Montezuma <br />County and in part within the reservation bOllntiaries of the Ute Mountain Ute <br />Tri be (Tri bl'!). <br /> <br />The area along the proposed pipeline routes changes rapidly in climate anti <br />vegetal covel". The upper reaches of the pipeline are in a zone that receives <br />an average of 14 inches of precipitation per year, while at the terminal point <br />in the Town of Towaoc the average rainfall is only 10 inches per year. The <br />higher rainfall, plus more abundant irrigation, provides lush pasture land, <br />tree-canopied farm residence sites, and almost bog-like drainage ways in the <br />upper portions of the reach. Nearer to Towaoc, the vegetal cover becomes <br />native grasses, sage brush and arid plant types. <br /> <br />In the region of the pipeline, the extreme maximum and minimum temperature <br />range is approximately lOS'F to -30'F. The average maximum daily temperatures <br />in tl1e region occur during July and range from R6'F to 9;>oF. In January tl1e <br />average mi nimum daily temoeratures are from l20F to lS'F. The ground <br />elevation along the pipeline routes is between 6400 feet anti S700 feet. <br /> <br />1-1 <br /> <br />1040c <br />