My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00507
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153513
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I Number <br />I 2.1 <br /> 3.1 <br />I 3.2 <br />3.3 <br /> 3.4 <br />I 3.5 <br />3.6 <br />I 3.7 <br />3.8 <br />3.9 <br /> 3.9A <br />I 3.10 <br />3.11 <br />I <br /> 3.12 <br />I 4.1 <br /> 4.2 <br />I 4.3 <br />4.4 <br /> 4.5 <br />I 4.6 <br />4.7 <br /> 6.1 <br />I 6.2 <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />LIST OF TABLES <br /> <br />Title Paqe <br />Surrmary of Towaoc Municipal Water Supply Recorr\s ::>-::> <br /> <br />Estimated Towaoc \~ater Demand Peaki ng Factors 3-fi <br />Estimated Pipeline Flows for 1000 i1f/vear (in cfs1 3-7 <br />Flow/Volumetric Comparison 3-A <br />AWWA Recorrmender\ Fire-Flows 3-9 <br />Elevations and Design Heads Cortez to Towaoc Storage 3-12 <br />Tanks Half-Full Conditions <br /> <br />Tank Inflow Volumes Required for 10-Day Perior\ 3-13 <br />Pipe Size and Length 3-14 <br />Maximum Delivery Flow Rates 3-14 <br />Pipe Type Comparison 3-23 <br />Si ze s by Pi pe Type 3-44 <br />Summary of Alternative Pipeline Estimated Costs 3-43 <br />Towaoc Pipeline Cost Estimates (Sheet 1 of 41 3-47 <br />Towaoc Pipe1 ine Cost Estimates (Sheet 2 of 41 3-48 <br />Towaoc Pipeline Cost Estimates (Sheet 3 of 41 3-49 <br />Towaoc Pipeline Cost Estimates (Sheet 4 of 41 3-50 <br />Cost Summary of A1 i gnment and Si ze Opti ons 3-51 <br /> <br />Pressure Reducing Valve ~easured and Computed Values 4-3 <br />Recommended and Adjusted PRV Downstream Set Points 4-5 <br />Existing System Performance Summary 4-6 <br />Upper and Lower Pressure Zone Performance Summary 4-11 <br />New Loop Line Number 127 Performance SlJmmary 4-15 <br />New Loop Lines 129 and 130 Performance Summary 4-17 <br />Cost Summary (Cateqories A through D1 4-2A <br /> <br />Construction Fund AllQcation Summary fi-4 <br />Potential Least Cost Summary fj-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.