My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00507
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153513
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2.0 WATER DEMAND <br /> <br />2.1 General <br /> <br />The feasibility investigations for a pipeline system to deliver municipal and <br />industrial water normally depend on detailed analysis of projected population <br />increases and water demand estimates to support sizing of the delivery <br />system. For the Towaoc system, the u1 timate water ri ght of 1,000 af per year <br />is a predetermi ned amount. The ana1ysi s of water demands requi red in thi s <br />study is therefore only to establish the temporal distribution of the <br />1,000 af, and to provide a basis for estimating when the full allocation might <br />be use!!. <br /> <br />In this chapter the historical and existing water use pattern of the Tribe is <br />presented and projecti ons are made of popul ati on increases. It is expected <br />that the water demand pattern wi" change in the future as 'I better water <br />quality and a more firm supply becomes available. A prominent factor in <br />regard to short-term demands is adequate flow rates to meet fire-flow <br />requi rements. Upgradi ng the fi re-fl ow caoabi1 iti es may 1 ead to reducti ons in <br />insurance rates within the areas being served. <br /> <br />The variations of water use due to the seasonal changes are prominent in the <br />semi -ari d regi ons of the west and southwest Uni ted States. The monthly, <br />daily, and hourly peak flow requirements are therefore key elements for <br />developing pipeline sizing recommendations. <br /> <br />2.2 Historical Records <br /> <br />Reliable and long term documentation of the historical usage rates are not <br />available for Towaoc since only 1 imited records have been kept. Table 2.1 <br />contains a summary of pumping records of the Towaoc municpa1 water supply <br />system for the period from Oecember, 1985 to June, 1987. Water is pumped from <br />the exi sti ng unnamed reservoi r near State Hi ghway 566 to the storage tanks <br />above Towaoc. In addition to the pumped water listed in Table 2.1, water has <br />also been supplied to Towaoc from a ground-water infiltration gallery. Only a <br /> <br />2-1 <br /> <br />1059c <br />
The URL can be used to link to this page
Your browser does not support the video tag.