Laserfiche WebLink
<br />I <br />I <br />I- <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I- <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I- <br />I <br /> <br />- <br /> <br />. <br /> <br />LIST OF MAPS AND EXHIBITS <br /> <br />FIGURE <br /> <br />1-1 <br />4-1 <br />4-6 (a) <br />4-6 (b) <br />5-1 <br />5-2 <br />5-3 <br />5-4 <br /> <br />Location Map <br />Cone Reservoir Watershed Map <br />Simulated Reservoir Operation <br />Historic and Projected Water Supply <br />Reservoir Configurations and Land Ownership <br />Surface Geology Depiction <br />Geologic Section <br />Dam and Appurtenant Works <br /> <br />TABLE 4.2 Ideal Water Demand for Land <br /> 4.3 (a) Period of Record for Gages <br /> 4.3 (b) Average Annual Runoff <br /> 4.5 (a) Current Storage Rights <br /> 4.5 (b) San Miguel WCD Water Rights <br /> 4.5 (c) Expected Water Yield <br /> 5.1 Borrow Soils Test Result <br /> 6.1 (a) Construction Cost <br /> 6.1 (b) Alternate Construction Cost <br /> 7.1 Summary of Revenue <br /> 8.1 (a) Size and Components of Bond Issue <br /> 8.1 (b) Size of Alternate Bond Issue <br /> 8.1 (c) Cash Flow of Construction Funds <br /> 8.1 (d) Cash Flow of Alternate Construction <br /> 8.1 (e) Project Repayment Schedule <br /> 8.1 (f) Alternate Construction Repayment Schedule <br />