My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00505
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153419
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />RICHARD P. ROSE <br /> <br />REGISTRATION <br /> <br />Professional Engineer, 1976 - California, 125713 <br />Professional Engineer, 1979 - Colorado, #16354 <br /> <br />EXPERIENCE <br /> <br />1979 to Present <br /> <br />Western Engineers, Inc.; Project manager for preparation of an Environmental <br />Impact Statement for the Water Users Association No. 1 Taylor Draw Dam; project <br />manager for construction of Phase II Northside Pipeline Project, two 5-million <br />gallon, steel storage tanks and an under water river pipeline crossing for the <br />Ute Water Conservancy District; participated in the preparation of feasibility <br />report for the Ute Water Conservancy District 's $30 million expansion proj ect <br />and its preliminary design; responsible for obtaining public agency permits for <br />the pipeline right-of-way; developed preliminary design for cost estimates for <br />concrete arch, Azure Dam. <br /> <br />1979 to 1980 <br /> <br />Project manager, Bookman-Edmonston Engineering, Inc., Sacramento, California; <br />?roject manager for World Bank/United Nations Development Project Egyptian <br />Industrial Wastewater Survey; advised Egyptian Ministry of Irrigation staff on <br />the establishment of a wastewater monitoring program including sample <br />collection, preservation, and analyses; coordinated field collection of <br />information regarding water use and wastewater production from Egyptian <br />industries, and prepared summary report for the World Bank. <br /> <br />1977 to 1979 <br /> <br />Senior water quality control engineer, California Central Valley Water Quality <br />Control Board, Sacramento; chief of Delta Regulatory Unit which performed <br />water quality investigations of municipal and industrial waste discharges into <br />the Sacramento-San Joaquin Delta. <br /> <br />Delta Regulatory Unit; performed monitoring and surveillance of discrete <br />oischarges for compliance with California and EPA water quality standards; <br />nitiated investigation of ground water pollution in Lathrop area that resulted <br />cn major civil and criminal actions. Dealt with municipal and industrial <br />leaders and in public matters of water pollution including testifying in public <br />nearings and litigation. <br /> <br />1975 to 1977 <br /> <br />Area engineer, California Central Valley Quality Control Board; inspected and <br />sampled waste discharges from industrial plants in Sacramento and Contra Costa <br />Counties. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.