My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00504
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:58:30 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153334
Contractor Name
Henry Waneka Mutual Reservoir Company c/o City of
Contract Type
Loan
Water District
6
County
Boulder
Bill Number
FSA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />VII. PROJECT EYALUATION AND FINANCIAL PROGRAM <br /> <br />I <br /> <br />A. General <br /> <br />I <br />I <br /> <br />I <br /> <br />The feasibility of the proposed improvements to the Waneka Dam and Res- <br /> <br /> <br />ervoir is dependent upon the revenues generated versus the expenditures for <br /> <br /> <br />the project. Presented in this chapter is the projected expenditures and the <br /> <br /> <br />revenues that would be generated to pay the estimated costs. Comparisons are <br /> <br /> <br />made for both the Rehabilitation and Enlargement alternative. <br /> <br />I <br /> <br />B. Projected Expenditures <br /> <br />I <br /> <br />I <br /> <br />The details of the estimated project costs were presented in Chapter-VI. <br /> <br /> <br />How these costs are distributed throughout the project life are presented here- <br /> <br /> <br />in. The costs are divided into annual Operations and Maintenance ($12,000), <br /> <br /> <br />Replacement ($100,000 and $200,000), Capital Improvements ($1,233,OOO and $1,908, <br /> <br /> <br />000), Engineering ($160,000 and $20,000), and Land Acquisition ($25,000 and <br /> <br /> <br />$30,000) and are presented in Table-9 (page 49). The Operations and Maintenance <br /> <br /> <br />Costs are inflated 8% annually, based upon the Engineering News Record Construc- <br /> <br /> <br />tion Cost Index. The Replacement Cost was considered to occur approximately once <br /> <br /> <br />every 20 years, since the major replacement components would be concrete struc- <br /> <br /> <br />tures and only a partial replacement would be required. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />The Capital Improvements are scheduled for the 1983 period, with the design <br /> <br /> <br />portion of the engineering costs occuring in 1982, and the inspection costs <br /> <br />occuring during construction. An annual engineering cost was also included <br /> <br /> <br />as part of the inspection program for the structure. <br /> <br />I <br /> <br />C. Projected Income <br /> <br />I <br />I <br /> <br />Revenues will be received from water utility serVice charge, connection <br /> <br /> <br />fees, and water stock assessment. The details of the revenues are presented <br /> <br />I <br /> <br />-29- <br />
The URL can be used to link to this page
Your browser does not support the video tag.