My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00504
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:58:30 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153334
Contractor Name
Henry Waneka Mutual Reservoir Company c/o City of
Contract Type
Loan
Water District
6
County
Boulder
Bill Number
FSA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />! I <br /> <br />I <br /> <br />IV. WATER REQUIREMENTS <br /> <br />I <br /> <br />A. Storage Requirements <br /> <br />I <br /> <br />The Henry Waneka Reservoir currently provides storage for agricultural <br /> <br /> <br />use and for municipal/industrial use through the City of Lafayette shares. <br /> <br /> <br />Due to the growth in the Lafayette area, the anticipated future use of the <br /> <br /> <br />reservoir is mainly for municipal and industrial raw water storage. The <br /> <br /> <br />water requirements will therefore be based primarily On the needs of the <br /> <br /> <br />City of Lafayette. However, since the agricultural use will continue in the <br /> <br /> <br />future, the agricultural requirements will also be included, based upon pre- <br /> <br /> <br />sent demands. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />The future water demands of the City of Lafayette have been previously <br /> <br /> <br />investigated. Also, the water system components, needed improvements and <br /> <br /> <br />expansions, existing water rights and potential future sources, and storage <br /> <br /> <br />requirements have been addressed. The reported present demands of the City <br /> <br /> <br />are approximately 1,400 AF per year for a 1980 population of 9,000. The absolute <br /> <br /> <br />minimum amount of storage to effectively utilize the City's water rights present- <br /> <br /> <br />ly transferred to municipal use is estimated to be approximately 2,000 acre-feet. <br /> <br /> <br />When the population reaches 20,000, then the raw water storage requirements will <br /> <br /> <br />increase to 4,000 acre-feet. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Although there are several storage alternatives available, including Gross, <br />Man,hall, Base line, Leggett-Hillcrest, Valmont, Panama, and Waneka Reservoirs, <br />the only storage that is immediately available to the City is the Wanek a Reser- <br />voir. The decreed capacity of Waneka is approximately 662 acre-feet of which <br />the City owns about 410 acre-feet, or 62%. Due to the physical limitations of <br />the reservoir and the storage restrictions imposed by the State Engineer's Office, <br />the available storage is about 420 acre-feet of which the City has rights to <br />approximately 260 acre-feet, well below the minimum requirements. Therefore, to <br />meet even present population requirements, a substantial increase in the raw <br />water storage is required. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />II <br /> <br />I <br /> <br />-14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.