My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00502
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153419
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,'" <br /> <br />, <br /> <br />'. <br /> <br />I. PLAN OF STUDY <br /> <br />A. Purpose <br /> <br />The purpose cf the Cone Reservoir Feasibility Study is to <br /> <br /> <br />determ:l.ne the design requirements for enlarging the existing Cone <br /> <br /> <br />~rvoir to hold approximately 4,000 acre-feet of additional <br /> <br /> <br />~city, and to determine construction costs, manner of operation, <br /> <br /> <br />and method of repayment. <br /> <br />B. Level. of Investigation <br /> <br />This will be a complete feasibility study performed in <br /> <br /> <br />sufficient detail ~c provide lIccurate cost estimates and repayment <br /> <br /> <br />schedules. as well as providil).g sufficient geologic and hydrologic <br /> <br /> <br />information to initiate discussions with the State Engineer regarding <br /> <br /> <br />preferred design cc=figuration. <br /> <br />C. Previous Work <br /> <br />The San Miguel Water Conservancy District has committed <br /> <br /> <br />approximately $30,000 in advancing the proposed Cone Reservoir <br /> <br /> <br />Enlargement to its current status. These expenditures have provided: <br /> <br />1. A reconnaissance level evaluation of. various high level <br /> <br /> <br />reservoir sites and improvement plans, and the determination <br /> <br /> <br />that Cone Reservoir reptesents the most cost effective and <br /> <br /> <br />practical first stage development. <br /> <br />2. Preliminary water supply lInalysis. <br /> <br />3. Aerial photography of .dam and reservoir area and the preparation <br />of detailed topographic Illaps at a 5 foot contour interval for <br />the reservoir and at a 2 foot interval for the dam. <br /> <br />4. Two core holes on the right abutment and preliminary geologic <br />appraisal. <br /> <br />-1- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.