Laserfiche WebLink
<br />, <br /> <br />" " <br /> <br />". <br /> <br />TASK DESCRIPTION - Continued <br /> <br />( <br />"-- <br />'\ <br />I <br /> <br />11. <br /> <br />Prepare Feasibility Level Designs and Drawings - Design will <br /> <br /> <br />essentially be limited to dam cross-section and stability <br /> <br /> <br />analysis. outlet works and spillway. Some minimal improvement <br /> <br /> <br />work may be included on COnveyance facilities. Since this is an <br /> <br /> <br />off-channel reservoir, spillway design flood analysis will be <br /> <br /> <br />minor. Two 24 x 36 drawings will be prepared. Current land <br /> <br /> <br />ownership will be shown on the reservoir map. <br /> <br />/ <br /> <br />, <br />/ <br /> <br />Chapter VI - Estimated Costs <br /> <br />12. Determine Quantities of C<:mstruction Items - A list of items <br /> <br /> <br />similar to a bidding sched~le will be prepared. Quantities will <br /> <br /> <br />be estimated by accepted lOethods. Right of way costs will be <br /> <br /> <br />included as ac add-on afte~ direct construction costs. <br /> <br />13. Determine Unit Price - Unit prices will be at the 1984 level and <br />will be detennined from ..bstracts of recent bids on similar <br />types of work in the Weste~ Colorado area. <br /> <br />14. Prepare Summary of Estimated Costs - Format will follow that <br />recommended by ewCB. A 20k contingency factor will be added <br />on. <br /> <br />15. Determine Operation, Maintenance and Replacement Costs - These <br /> <br /> <br />costs will be based on historic operating costs for the existing <br /> <br /> <br />reservoir. <br /> <br />Chapter VII - Project Evaluation <br /> <br />16. Determine Repayment Ability - Since the water' developed by this <br />project will be supplemental, the repayment ability will be <br />primarily based on an expressed "willingness to pay" by the <br /> <br />water users. <br /> <br /> <br />-$- <br />