My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00502
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153419
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br />" <br />.. , <br />, . < <br /> <br />'. <br /> <br />k ~5 rOO;)..... <br /> <br />':urm 6-AC.02A <br /> <br /> <br />$29,500 <br /> <br />CONTRACT. <br /> <br />THIS CONTRACT, made this 1st day,of 'June <br />State of Colorado for the use and benefit of the De.Eartmeql. of .1 <br />Colorado Water Conservation BOaro), <br />'. hereinafter.Tl;'ferred to as'the State,' and '2 the San Miguel <br />Box 36, Redvale. CO 81431, <br />hereinafter referred 10 as the contractor, <br /> <br />, WHEREAS. ~u.lhority ex.ists in the Law and Funds have bee'n 'budgeted, apprOPriate~ and otherwise made. <br />available and a sume.legt u.nencumb. ered balance thereof ,remains ava~'1 ble fff3yment in Fund Number 4008 . <br />elL Account Number 26 5X . Contract Encumbrance Numb~rC ~ ' and <br />ABL Account Number 12650, Org. Unit 11- - .' <br />, I <br />.WH.EREAS, required approv3J, c1ear:mce and coordination has been accomplished' from and with appropriate <br />agencies; and <br /> <br />19 8 ~ by and between the <br />Natural Resources <br /> <br />Water Conservancy lS r~ct, <br /> <br />\oJHEREASt pur-suant to the provisicn~ of section '37-60-119t <br />C;o.1orado Revised Statutes 1973. as amended" the State is <br />authorized to construct certain water projects for the benefit of <br />the people of the State of- Colorado ~- and <br /> <br />WHEREAS, the San Miguel Water Cohse~vancy 'District has made <br />application to the ~tate for the irnprove~ent ~f the existing. <br />facility; .and <br /> <br />WHEREAS, the Cantractq:r; is a C~:mservancy Distr.ict ~ithin the <br />State of Colorado: <br /> <br />NOW THEREFORE, it is hereby agreed 'that <br /> <br />1. The Contractor shall have a feasibility report'~repared <br />and directed to the problem of' enlarging. the existing Cone ' <br />Reservoir. in accordance with .a prop'osal for a project feasi,bility <br />report prepared by the consulting engineering firm of Western' <br />Engineers Inc. (the Cons'ultant) and approved by the. State~ <br />received oft May 16, 1984,' which proposal' is attached hereto as <br />Exhibit A and made a part of this contract. <br /> <br />2. Fifteen (15) copies of the'final report called for in <br />this contract shall b~ furnish~d to the S~ate not later than <br />October 15, 19$4, unless sqch time is extended by mutual <br />agreement of the parties hereto in writing. <br /> <br />3. As compensation fa:r .the services of the Contractor, :the <br />State shall' 'pay to the Contractor .the sum: of, Twenty-Nine Thousand <br />Five Hundred Dollars .($29,500) in the manner following: <br /> <br />a. Sixty percent '(60%), to' wit, Sevent'een Thousand <br />Seven Hundred Dollars ($17,700) of the_ total- amount. due <br />in two. (2) monthly installments of Eight Thqusand 'Eight <br />Hundred 'Fifty Dollars ($8,850) each, commencing'on ' <br />July 1, 1984, <br /> <br />'b. The remaining forty percent (40%), to wit, Eleven. <br />Thousand Eight Hundred Dollars ($11,800) within forty <br />(40) days following receipt and acceptance of the <br />written report specified in paragraph 2 of this <br />contract. . <br /> <br />4. The, t.otal Cost of services .t~. be rend~red fo'r the. <br />Contractor by the Consultant is Fifty-Nine -Thousand Five 'Hundred <br />Dollars ($59,50_0) and the' Contractor sha;1.1 pay the sum of .Thirty <br />Thousand Dollars ($30,000) by the. credit given to him for work <br />carried out previo~slY to the extent of ~Thirty Thousand Do~lars <br />($30,000) , <br /> <br />395-5lO1-1014 <br /> <br />202 <br />slm <br /> <br />Page 1 of ---4..- pages <br />.(S~\' i"~trlll:li(H'" (H' rC\'trsc of 1;ISI rage.) <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.