My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00501
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:26 AM
Creation date
10/5/2006 11:58:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153318
Contractor Name
San Luis Valley Irrigation District
Contract Type
Loan
Water District
20
County
Hinsdale
Bill Number
SB 79-537
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />! <br /> <br />.....rm6-At..:-02A <br /> <br />DEPA <br /> <br />1-1 ( JZi / J" <br />'".NT OR AGt::NCY NUMBI::R <br /> <br />CONTRACT ROUTING NUMBER <br />,~ \', <br />$90,000.00 <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made Ihis 14th day of September 197.2. by and between the <br />Slate oC Colorado Cor the use and benefit of the Department Of"l Natural Resources <br />(Colorado Water Conservation Board) <br />herdnafter referred to as the Stale, and"2 ~;:m T II; ~ \1:.11 Py Trri g:Jr-i on ni ~rri ~t <br />(Rin ~r~nnp Rp.~prvn;r), P 0 Rnx 617, r.p-nter, r.oloTado 8112~ <br />hereinafter referred 10 as the contractor. <br /> <br />WUEREAS, authority exist:t in the Law lInd Funds have been budgeted, appropriated and otbclWise made <br />available and a surficient unencumbered balance thereof remains available for payment in Fund Number 4008 , <br />G/L Account Number t;'&o<;1, Contract Encumbrance Numbe,.c';'~3/S?'; and <br /> <br />WHEREAS. rClluircd ;:approval. dearance and coordination has been accomplished from and with appropriate <br />Ilgencies; and <br /> <br />WHEREAS, 'J pursuant to Title 37, Article 60, Colorado Revised <br />Statutes 1973, as amended, the State, through the Colorado Water <br />Conservation Board, may construct wacer resource projects and make the <br />waters available therefrom to the residents of the State of Colorado <br />upon conditions to be determined by the Colorado Water Conservation <br />Board; and <br /> <br />WHEREAS, the Contractor is an irrigation district in the State of <br />Colorado and wishes to undertake improvements of a dam hereinafter <br />called the project, for the members of the San Luis Valley Irrigation <br />District in Center, Colorado, at an estimated cost of One Hundred <br />Thirteen Thousand Dollars ($113,000); and <br /> <br />WHEREAS, the State, through the Colorado Water Conservation Board, <br />has agreed to construct said project and to sell the same to the Con- <br />tractor upon mutually agreeable terms and conditions, subject to the <br />approval of appropriations for that purpose by the Colorado General <br />Assembly and the Governor of the State of Colorado; and <br /> <br />WHEREAS, pursuant to Senate Bill No. 537, Fifty-Second General <br />Assembly of the State of Colorado, duly enacted by the Colorado General <br />Assembly and approved by the Governor of the State of Colorado, there <br />was appropriated to the Colorado Water Conservation Board the sum of <br />Ninety Thousand Dollars ($90,000) for improvement of the Rio Grande <br />Reservoir; and <br /> <br />WHEREAS, the Contractor has available from its own sources <br />sufficient funds to construct the remainder of the project; <br /> <br />NOW THEREFORE, in consideration of the mutual and dependent <br />covenants herein contained, it is agreed by the parties hereto as follows: <br /> <br />A. The Contractor agrees that it will: <br /> <br />1. Cause said project to be constructed within one (1) year of the <br />date of this contract in accordance with the project plans and specifi- <br />cations and any necessary modification thereof approved by the State. <br />No payments will be made under this contract until the project plans and <br />specifications are approved by the' State. The above-mentioned time may <br />be extended by the State if such time is insufficient because of acts of <br />God or other acts or circumstances beyond the control of the Contractor. <br /> <br />2. Conveyor cause title to be conveyed by deed or other proper <br />conveyance to the Colorado Water Conservation Board, Department of Natural <br />Resources, State of Colorado, the following portions of the proposed <br />project facilities: <br /> <br />Page I of..5..... pag~ <br />-(See instructions on revery) oll;ut page.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.