My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153456 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153456 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153456
Contractor Name
Grand Valley Irrigation Company
Water District
0
County
Mesa
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Lehman Pond - President <br />Debbie J. Clark - Secretary-Treasurer <br />R. M. Henderson. Superintendent <br /> <br />. <br /> <br />Telephone 242-2762 <br /> <br />e <br /> <br />Owns and Operates <br />THE GRAND VALLEY CANAL <br /> <br />THE GRAND VALLEY IRRIGATION COMPANY <br /> <br />688 - 26 Road <br />GRAND JUNCTION, COLORADO <br />81501 <br /> <br />November 4, 1985 <br /> <br />J. William McDonald <br />Colorado Water Conservation Board <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />Demmus D. Harvey, Jr. <br />Colorado Water Conservation Board <br />222 South 6th Street, Suite 420C <br />Grand Junction, Colorado 81501 <br /> <br />Re: Stage Two, Grand Valley Unit, <br />Colorado River Basin Salinity Control Project, <br />Lateral Organization Grant <br /> <br />Gentlemen: <br /> <br />The Board of Directors of The Grand Valley Irrigation <br />Company have prepared the following cost estimate for <br />accomplishing Stage Two of the Grand Valley Unit of the Colorado <br />River Basin Salinity Control Project. In preparing this <br />estimate, we have assumed that Stage Two of the Project includes <br />expenditures up to approval "as to form" of a contract between <br />the United States and The Grand Valley Irrigation Company for <br />funding and implementation of the Salinity Control Project. Our <br />estimate is organized according to the specific items included on <br />the Cost Estimating Worksheet provided by the Bureau of <br />Reclamation. <br /> <br />A. LEGAL REVIEW OF CORPORATE DOCUMENTS AND APPLICABLE <br />STATE AND FEDERAL STATUTES; MODIFICATION OF <br />CORPORATE DOCUMENTS AND STATUTES; AND PREPARATION <br />OF SUMMARY REPORT. <br /> <br />1. Legal Research. <br /> <br />Hours <br /> <br />a. <br /> <br />Review Bylaws, Articles of <br />Incorporation, and other <br />corporate documents <br /> <br />4.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.