Laserfiche WebLink
<br />? <br />" <br /> <br />'C' <br />~ <br /> <br />. <br /> <br /> <br />$30,000 <br /> <br />CONTIlACT <br /> <br />vi Nt.)- <br /> <br />THIS CONTRACT. madt' Ihis 10th day of Februarv 198..&... by and belween Ihe <br />Slale.' of fnlnr"dll for Ihe u~(' and hent'fir of Itle lkp:nlmenl of ., Na tural Resources <br />(Colorado Water Conservation Board), .. <br />l1l'reinaflrr (('(erred to as the Slall'. :Ind"2 The Grand Valley Irrl.qatl.on Company, <br />688-26 Road. Grand Junction, CO 81501, <br />hrreinaflcf referred 10 as the ('Ol1traclor. <br /> <br />WHEREAS. aUlhoril)' ('xisls in Iht' law and Fundlo have been budgeted. ap(lroprialed and otherwise made <br />avaibblc and a suHidenl unencumbered bal:lIlce Iheftof remains 3vaila~~%aymenl in Fund Number 1 n n 1 . <br />G/L Account Numher5501X . COlllrat" Encllmhrance Number ('V, and <br />ABL Account Number 15010, Org. Unit 80-00-501, <br />WHEREAS. ree/ui,ed appru\':d. dC:U:ll1ce and cOllldinalinn has been accomplished from and with 3j'propriale <br />llgt'ncies: and <br /> <br />WHEREAS, the Colorado River Basin Salinity Control Act. 43 <br />U.S.C. 1571. ~~. (Public Law 93-320, as amended by pUblic Law <br />98-569) authorized the Secretary of the Interior to construct the <br />Grand Valley Salinity Control Unit (hereinafter referred to as <br />tbe "unit"): and <br /> <br />WHEREAS, construction of Stage II of the unit will entail <br />lining. or placinq into pipe. of laterals under the canals which <br />divert water to the Grand Valley: and <br /> <br />WHEREAS, the Colorado River Basin Salinity Control Act. as <br />amended. requires that the laterals thus improved be operated and <br />maintained by non-federal entities: and <br /> <br />WHEREAS. the laterals under the Contractor's canal system are <br />currently owned and operated by numerous private individuals or <br />informal groups and associations; and <br /> <br />WHEREAS. the secretary of the Interio:. acting through the <br />United States Bureau of Reclamation (hereinafter referred to as <br />Reclamation) is requiring that the laterals be organized into <br />entities enabled bY the laws of the State of Colorado with which <br />it can contract for the long-term operation and maintenance of <br />the improved laterals; and <br /> <br />WHEREAS. the Contractor is willing to acquire the ownership <br />of the laterals under its canal system in order that it. might <br />contract with Reclamation for the long-term operation and <br />maintenance of the improved laterals; and <br /> <br />WHEREAS. the Contractor must conduct a review of its legal <br />authorities and accounting procedures and negotiate with <br />Reclamation a contract for the long-term opetation and <br />maintenance of the improved laterals (said activities hereinafter <br />being referred to as "Stage II activ~tiesQ); and. <br /> <br />WHEREAS, the state and Reclamation desire that the Contractor <br />undertake certain activities and incur certain expenses and <br />Obligations preliminary to. and in order to prepare itself to <br />conduct. Stage II activities; and <br /> <br />WHEREAS. the State has promised to compensate and reimburse <br />the Contractor for expenses paid or incurred in carrying out <br />these preliminary activities: and <br /> <br />I'a!:l' I llflra~l'~ <br />'c\n'''''IIII''lI>1l''''''''H'r'''''II;''II';I~l".1 <br />