My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00495
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:47 AM
Creation date
10/5/2006 11:58:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153678
Contractor Name
Lower Arkansas Water Management Association
Contract Type
Loan
Water District
67
County
Prowers
Bill Number
SB 96-124
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />HtIIIr & WILLIAMSEN, PC. 303tllf165 <br /> <br />AITACHMENT <br />Agenda Item CFc <br />January 19, 1994 <br /> <br />To date, LAWMA and its members have expended more than $30,000 for engineering <br />and legal evaluation of water rights, for preparation of the well data base and mapping, and <br />for well testing. It anticipates that its members will expend more than $30,000 in 1994 to <br />complete the initial testing of their wells. <br /> <br />NEED FOR PROJECT <br /> <br />LAWMA is concerned that well owners in the Arkansas River basin will be faced with <br />more stringent regulations governing the use of ground water. It also is concerned that more <br />stringent regulations will result in the full or partial curtailment of wells and that such <br />r.llrtailment will result in a sionificant economic hardship to its members. to the local area, and <br />10 Ihis fJ"'l or lh.. st"I... LAWMA is illl..,..:;lt:<.I, tht:rt:fore, in developin a pro ect to re lace ~ <br />depletions to Colorado water rillhts and to Kansas I necessary un er t e eventua ru inQ of <br />the U.S. Supreme Court in Kansas v, Colorado. <br /> <br />At the present time, LAWMA's members operate 375 irrigalion w..lIs, 26 <;oIlHrI'jf<;iClI <br />wells, and 60 municipal wells. The 375 irrigation wells represent about 65 percent of the <br />total irrigation wells in the water district. These wells provided supplemental or full water <br />supplies for about 50.000 acres. They involve a total decreed capacity of more than 1,140 <br />cfs or about 70 percent of the total decreed irrigation capacity in the water district. By <br />proportioning based on decreed capacity. these wells provided an average of about 70,000 <br />acre-feet annually during 1976-85 or about 18 percent of the total irrigation water supply. <br />During 1977, LA WMA' s wells provided a larger part of the total water supply. As mentioned <br />previously, the City of Lamar and the Towns of Ilolly, Ceds. Ilugo, and I(it Carson are <br />LAWMA members. Lamar is the largest city in the water district and Holly, Eads, Hugo, and <br />Kit Carson are major towns. <br /> <br />LAWMA's need is for a project to allow its members to continue to have the full usage <br />of their wells for their various irrigation, municipal, and commercial purposes, The project will <br />provide replacement water to Colorado water rights.on the Arkansas River and its tributaries, <br />and to Kansas if required by the U.S. Supreme Court in Kansas v. Colorado. The proiect will ~ <br />involve 1 I the development of procoduro~ to dotermine tho amount~ of pumping by it~ <br />members and the resulting stream depletion, 21 the acquisition of water and water rights, <br />3) the development and acquisition of physic~1 facilities, and Al the preparation of .8 dotailed <br />operating and management plan, <br /> <br />LAWMA's membership has been increasing steadily since its formation, It anticipates <br />a significant increase in membership with the advent of more stringent well regulation, and <br />contemplates that eventually it will cover all active irriQation. municipal, and commercial wells <br />in Water District 67. <br /> <br />PLAN OF STUDY <br /> <br />The study involved in this request is really more than just a feasibility study. It <br />involves the development of a detailed plan to make replacements and will thereby establish <br />the feasibility of the project. LAWMA believes that the detailed replacement plan can be <br />prepared over a period of approximately 12 months. The full implementation of the plan may <br />require several years depending on the level of well regulation imposed by the State Engineer, <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.