My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00495
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:47 AM
Creation date
10/5/2006 11:58:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153678
Contractor Name
Lower Arkansas Water Management Association
Contract Type
Loan
Water District
67
County
Prowers
Bill Number
SB 96-124
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />. <br /> <br />Agenda Item CFc <br />January 19, 1994 <br />Page two <br /> <br />2. Required that Interest on the loan accrue from the date the funds are drawn by <br />LA WMA. Allowed that repayment of the loan principal and accrued interest may <br />be included as part of a subsequent loan for the actual construction of the project. <br />Required that if the project is not built, and/or there is no subsequent Construction <br />Fund loan, then this feasibility study loan will be repaid over a 10 year period, <br />amortizing all principal and accrued interest, and <br /> <br />3. Required that loan approval be contingent upon staff review and acceptance of <br />the Plan of Study submitted by Helton & Williamsen, P.c., and <br /> <br />4. Required that loan approval be contingent upon review of LA WMA'S financial <br />condition and ability to repay the subject loan. <br /> <br />Attachments <br /> <br />C:\wp51\CFcJ19.cwc <br />
The URL can be used to link to this page
Your browser does not support the video tag.