Laserfiche WebLink
— _ �,i� 0 CHANGE ORDER • <br />(Instructions on reverse side) No. 02 <br />PROJECT: NORTH POUDRE RESERVOIRS DATE OF ISSUANCE: <br />No. 5&6 REHABILITATION <br />OWNER: <br />(Name, THE NORTH POUDRE IRRIGATION COMPANY <br />Address) WELLINGTON, COLORADO <br />CONTRACTOR: <br />NATIONAL CONSTRUCTION <br />BOULDER, COLORADO <br />CONTRACT FOR: <br />OWNER's Project No. <br />1/26/95 <br />NA <br />ENGINEER: SMITH GEOTECHNICAL <br />FORT COLLINS, CO <br />ENGINEER's Project No <br />NA <br />You are directed to make the following changes in the Contract Documents. <br />Description: ADD 100 CY of 12-inch Riprap and 50 CY of bedding on the <br />upstream west side of spillway. <br />CONSTRUCT pressure relief drain between outlet and flume. <br />Purpose of Change Order: <br />Riprap: To reduce erosion from reservoir wave action. <br />Blanket Drain: To control groundwater seepage and pressure. <br />9tftbPm-vA�1 M&wmm kwjwkmRim wd <br />ffgi�`�1M*N <br />CHANGE IN CONTRACT PRICE: <br />Original Contract Price <br />$ $1,368,364.00 <br />CHANGE IN CONTRACT TIME: <br />Original Contract Time <br />Per Documents <br />days or date <br />Previous Change Orders No. 01 ]("at -- <br />$ $21,062.50 <br />Net change from previous Change Orders <br />day, <br />Contract Price prior to this Change Order <br />$ $1,389,426.50 <br />Contract Time Prior to this Change Order <br />Per Documents <br />days or date <br />Net Increase (decrease) of this Change Order <br />$ $10,000.00 <br />Net Increase (decrease) of this Change Order <br />No Change <br />days <br />Contract Price with all approved Change Orders <br />$ $1,399,4 6_50 <br />Contract Time with all approved Change Orders <br />No Change <br />days or date <br />RECOMMENDED: <br />Enron e <br />EJCDC No. 1910-8-B (1983 Edition) l <br />Prepared by the Engineers' Joint Contract Documents C <br />APPROVED: <br />APPROVED: <br />r <br />by `', <br />.ti Contractor <br />(CWCB) <br />Contractors of Arm: nca. <br />