My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00493
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2024 8:26:02 AM
Creation date
10/5/2006 11:58:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153637
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 92-87
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCHEDULE A <br />COLORADO WATER CONSERVATION BCA7T <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br />1. Board approval of engineering firm and engineering agreement <br />between engineering firm and project sponsor. <br />2. Preparation of detailed plans and specifications for <br />authorized projects by consulting engineering firm. <br />3. Approval of detailed plans and specifications by Board staff <br />(plans and specifications for storage dams and reservoirs <br />must also be approved by State Engineer's Office). <br />4. Board staff approval of bidding for the project. Board <br />staff present at bid opening for construction. <br />5. Project sponsor may issue the notice of award and the notice <br />to proceed with construction to the contractor (both notices <br />must be approved by the Board staff before they are issued). <br />6. Conduct a pre -construction conference. Approval of <br />construction schedule by Board staff. <br />7. Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must be <br />approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency items <br />cleared by telephone. <br />S. The consulting engineer certifies that the project has been <br />completed according to approved drawings and specifications <br />and arranges for final inspection. <br />9. Final inspection and acceptance of as -built project by Board <br />staff. <br />10. Submittal of as -built drawings to Board staff for approval <br />and filing. <br />EXHIBIT D <br />